New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2001-02 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2001-02 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:40 AM
Creation date
6/1/2009 12:28:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br />~ OPERATING BUDGET AND RATE IiISTORY <br />The graphs on the following page show afive-yeaz Regional Operating Budget comparison, and <br />Regional Residential Sanitary Sewer costs over afifteen-year period. Because the Equipment <br />`' ' Replacement and Major Infrastructure Rehabilitation programs aze managed in the Eugene <br />operating budget, these programs aze incorporated into both the five-yeaz operating budget <br />comparison chart on page 22 and the five-year capital programs comparison chart on page 29. <br />In FY 96-97, the MWMC adopted a budget which was fully funded and would result in a <br />monthly regional sewer cost of $8.78 for the typical residential user based on 5,800 gallons. The <br />Commission also set a goal of maintaining this rate for five years, following staff <br />implementation of a competitiveness workplan. During this time, staff instituted many cost <br />saving measures to improve effectiveness and reduce costs. As a result changes were made in <br />i. <br />the RWP organizational structure and functions enabling the budget to be fully funded with the <br />;, ~ same rate. In FY 00-01, the Commission's goal of maintaining the same rate for five years was <br />achieved. <br />-; The FY 01-02 budget was prepazed anticipating a number of future cost drivers, including future <br />capital needs, SIW transition, utility cost increases, lower flows from industrial dischazgers, and <br />slower economic growth. The rate schedule, which will result in a monthly regional sewer cost <br />of $8.53 for the typical residential customer will fully fund the FY 01-02 proposed budget. It <br />will also provide additional revenue that can be used to offset rate spikes which may result from <br />future operating uncertainties and capital needs. Revenues in excess of current yeaz operating <br />and capital requirements will be held in a new Rate Stability Reserve, to help. sustain rates for <br />another five-year period. <br />Page 21 FY 01-02 Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.