Metropolitan Wastewater Management Commission Budget and Program Summary <br />~ OPERATING BUDGET AND RATE IiISTORY <br />The graphs on the following page show afive-yeaz Regional Operating Budget comparison, and <br />Regional Residential Sanitary Sewer costs over afifteen-year period. Because the Equipment <br />`' ' Replacement and Major Infrastructure Rehabilitation programs aze managed in the Eugene <br />operating budget, these programs aze incorporated into both the five-yeaz operating budget <br />comparison chart on page 22 and the five-year capital programs comparison chart on page 29. <br />In FY 96-97, the MWMC adopted a budget which was fully funded and would result in a <br />monthly regional sewer cost of $8.78 for the typical residential user based on 5,800 gallons. The <br />Commission also set a goal of maintaining this rate for five years, following staff <br />implementation of a competitiveness workplan. During this time, staff instituted many cost <br />saving measures to improve effectiveness and reduce costs. As a result changes were made in <br />i. <br />the RWP organizational structure and functions enabling the budget to be fully funded with the <br />;, ~ same rate. In FY 00-01, the Commission's goal of maintaining the same rate for five years was <br />achieved. <br />-; The FY 01-02 budget was prepazed anticipating a number of future cost drivers, including future <br />capital needs, SIW transition, utility cost increases, lower flows from industrial dischazgers, and <br />slower economic growth. The rate schedule, which will result in a monthly regional sewer cost <br />of $8.53 for the typical residential customer will fully fund the FY 01-02 proposed budget. It <br />will also provide additional revenue that can be used to offset rate spikes which may result from <br />future operating uncertainties and capital needs. Revenues in excess of current yeaz operating <br />and capital requirements will be held in a new Rate Stability Reserve, to help. sustain rates for <br />another five-year period. <br />Page 21 FY 01-02 Budget <br />