New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2001-02 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2001-02 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:40 AM
Creation date
6/1/2009 12:28:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br />• Billing and Collection costs will increase by $10,400 reflecting an increase in the utility <br />billing rate for the Springfield Utility Board (SUB). <br />• Program Expenses will increase due to an anticipated 20% increase in the NPDES permit fee <br />for the Water Pollution Control Facility, and taxes and other property management fees for <br />the Awbrey Lane Poplar Farm. <br />• Insurance will increase by approximately $30,000, reflecting increases in costs to add <br />coverage for the dewatering facility and poplar farm. Insurance costs have been separated <br />from Contractual Services. <br />• Attorney fees have been separated from Contractual Services and will remain stable. <br />• Cost adjustments (utilities, equipment maintenance, internal facility rent, and building <br />maintenance charges) were made between Public Works Administration, Regional <br />Wastewater Administration, and the Water Resources subprograms reflecting the Springfield <br />Environmental Services Division's move in FY 00-01. <br />• Internal Insurance costs will change beginning in FY 01-02. Previously, all costs for <br />administrating the City's insurance and employee benefits program were combined. In FY <br />01-02, they will be separated. Insurance costs will remain in the Internal Insurance Charges <br />line item and will reflect actual insurance experience. Costs to administer employee benefits <br />(estimated at $435 per FTE) will be shown in the Internal Employee Benefit line item. <br />Together, internal insurance costs will decrease by approximately $2,000 in FY 01-02. <br />• Employee Development costs increased by $1,080 to enable the Senior Civil Engineer to <br />attend a national conference and the Senior Environmental Technician to receive training for <br />a Wastewater System Operator certificate. <br />• Indirect costs decreased by $18,699 or 12% reflecting a recalculation in the Federal Cost <br />Allocation Plan following the Springfield Public Works Department reorganization in FY 00- <br />0L <br />• Utility costs are increased by 26%, reflecting anticipated higher energy costs. <br />• There are a variety of other minor cost adjustments (e.g. telephones, duplicating supplies, <br />phone equipment changes, data processing charges, internal vehicle and equipment) which <br />are small in dollar amount and by virtue, their changes appear large on a percentage basis. <br />Capital Outlay -Budget Request (Increase of $3,784] <br />Capital Outlay expenditures in the amount of $3,784 are proposed. <br />• In FY O1-02, the Chevy Corsica and Nissan pick-up will be replaced: The Corsica is due for <br />replacement and has experienced maintenance problems sufficient that replacement is <br />warranted. A reserve amount of $16,719 has accumulated in the City of Springfield Vehicle <br />and Equipment Replacement Fund for this vehicle. The extra capital outlay request of <br />$1,766 will enable staff to consider purchasing a higher fuel efficiency passenger sedan. <br />Page 12 FY O1-02 Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.