portion of the CSD's Series 1980 and 1982 bonds. This refinancing resulted in approximately <br />$615;000 in debt service savings. The GO bonds were retired in September, 2002. <br />Since the late 1980s, a number of projects have been completed using a combination of funds <br />remaining from the GO bonds, user fee revenue, and system development charges (SDCs) CIP <br />budgets were primarily composed of projects identified by the 1996 Eugene/Springfield Water <br />Pollution Control Facility (WPCF) Master Plan, the Biosolids Master Plan, and the Wet Weather <br />Flow Management Plan (WWFMP). The 1996 Master Plan provided an assessment of facilities <br />improvements needed to enable regional wastewater treatment facilities to meet their intended <br />design capacity and regulatory requirements, address system deficiencies, and improve safety <br />and operational performance. The Biosolids Management Plan and the WWFMP resulted from <br />recommendations included in the Master Plan. The Biosolids Management Plan remains the <br />basis for most of the biosolids-related CIP projects. <br />The WWFMP, provided the basis for wastewater treatment facility performance improvements <br />related to wet weather peak flow that were to be constructed over an eight to ten year period. In <br />order to identify the impacts of these projects on other treatment facility processes, a Wet <br />Weather Flow Pre-Design Project was initiated in FY 02-03. As work proceeded on the Pre- <br />Design Project, it became apparent that, due to increased environmental performance required by <br />the wastewater discharge permit and updated projections of population and capacity needed <br />through 2025, a comprehensive facilities planning effort was needed. The 2004 MWMC <br />Facilities Plan was a result of this effort and was adopted by the Commission and partner <br />agencies in June of 2004. <br />The 2004 Facilities Plan revealed several process areas which are at or near capacity and <br />identifies projects which will assure that all process areas will have sufficient capacity to meet <br />the needs of current and future users through the year 2025. The 2004 Facilities Plan also <br />identifies alternative future uses of the Seasonal Industrial Waste Facility and addresses possible <br />regulatory compliance issues which may arise in the coming years. <br />MWMC User Rates <br />!' The MWMC's user fee system was developed and implemented in 1985. State and Federal <br />I ~''; regulations require that MWMC's system of charges and rates generate sufficient revenue to pay <br />the total operation and maintenance costs necessary to fund the proper operation and <br />maintenance (including replacement) of the treatment works. Annual allocations are made to an <br />Equipment Replacement Reserve from user fee revenue. Funds from this reserve are used to pay <br />for timely replacement of equipment that has an expected life of 5 to 20 years and a value of <br />$10,000 to $200,000. User fee revenues are also used to fund capital projects. <br />MWMC System Development Charges <br />MWMC's original SDC, which was known as a Facilities Equalization Charge was first <br />implemented in 1991. In today's terms, the Facilities Equalization Charge was a reimbursement <br />SDC. In 1997, MWMC adopted a major revision to its SDC methodology. The new <br />methodology included, in addition to the reimbursement SDC, an "improvement" SDC based <br />' ~' upon a 5-year CIP. In 2004, MWMC completed a comprehensive update of its SDC <br />methodology. The new methodology, adopted by the governing bodies; retains the <br />i. <br />2005 MWMC Financial Plan Page 5 <br />