Metropolitan Wastewater Management Commission Budget and Program Summary <br />EXIIIBIT 5 <br />REGIONAL WASTEWATER PROGRAM <br />BUDGET SUNIMARY AND COMPARISON <br />ADOPTED AMENDED ADOPTED <br />BUDGET BUDGET BUDGET CHANGE* <br />FTE FY 02-03 FY 02-03 FTE FY 03-04 INC(DECR) <br />OPERATING BUDGET <br />Administration <br />Operations <br />Capital Contribution <br />Equip Repl -Contribution <br />Operating Reserves <br />Total Operating Budget <br />Fundi~: <br />Beginning Balance <br />User Fees <br />Other <br />Total Operating Budget Funding <br />CAPITAL PROGRAM BUDGET <br />8.40 $1,638,457 $1,787,237 8.40 $1,835,789 $197,332 <br />68.14 7,980,217 8,207,464 68.14 8,314,028 333,811. <br />1,869,671 1,869,671 750,000- (1,119,671) <br />473,910 473,910 481,098 7,188 <br />1,691,432 1,109,824 1,714,320 22,888 <br />-__ <br />76.54 $13,653,687 $13,448,106 76.54 $13,095,235 ($558,452) <br />SPRINGFIELD <br />Biosolids Mngt - Dewatering <br />Biosolids -Poplar Plantation <br />Biosolids -Water Reclamation <br />Biosolids -Sludge Main Access Vaults <br />Biosolids -Dredge Movement System <br />Biosolids -Groundwater Remediation <br />Biosolids -Line Lagoons <br />Electronic Records & Storage <br />Lab Remodel <br />EBUWBI Flow Monitoring <br />Pre-Design Study <br />Secondary Clarifier and Outfall DiffDesign <br />Engine Gen.- Digester Gas Filter <br />EUGENE <br />Equipment Replacement Purchases <br />Major Rehab <br />Major Capital Outlay <br />Total Capital Projects <br />Funding: <br />$2,127,327 $1,921,746 $1,151,870 ($975,457) <br />11,200,000 11,200,000 11,642,000 442,000 <br />326,360 326,360 301,365 (24,995) <br />$13,653,687 $13,448,106. $13,095,235 ($558,452) <br />0 50,000 0 NA <br />2,549,096 2,549,096 5,700,000 3,150,904 <br />0 0 0 <br />100,000 100,000 0 NA <br />0 0 150,000 NA <br />.100,000 100,000 0 NA <br />0 0 0 NA <br />0 0 50,000 NA <br />1,058,000 1,344,646 0 NA <br />190,000 190,000 135,000 (55,000) <br />900,000 900,000 600,000 (300,000) <br />0 0 0 NA <br />300,000 300,000 0 (300,000) <br />609,299 755,663 1,026,630 417,331 <br />495,338 642,195 182,000 (313,338) <br />0 0 0 NA <br />$6,301,733 $6,931,600 $7,843,630 $1,541,897 <br />SDC Reserve $1,788,000 $1,936,646 $2,125,000 $337,000 <br />Equipment Replacement 609,299 755,663 1,026,630 417,331 <br />Capital Reserve 3,904,434 4,239,291 4,692,000 787,566 <br />Major Rehab Reserve 0 0 0 NA <br />Total Capital Projects Funding. $6,301,733 $6,931,600 $7,843,630 $1,541,897 <br />Notes: * The Change (Inc/Decr) column compares the proposed FY 03-04 budget to the originally adopted <br />FY 02-03 budget column. <br />Page 19 FY 03-04 BUDGET <br />