Metropolitan Wastewater Management Commission Budget and Program Summary <br />CAPITAL. PROGRAMS <br />The RWP budget includes several capital programs, including the Capital Improvement Program <br />(CIP), the Major Infrastructure Rehabilitation Program, and the Equipment Replacement <br />Program. The. CIP consists of capital projects that are administered by the City of Springfield as <br />part of its contract responsibilities for MWMC. CIP projects typically provide for new or <br />expanded facilities and/or capacity enhancements. The annual CIP budget is administered by <br />Springfield and is separate from the Operating Budget. <br />The proposed FY 03-04 CIP is funded by a combination of SDCs, contributions from the <br />operating budget, and capital reserves. The proposed FY 03-04 CIP budget is summarized in <br />Exhibit 3 below, and described on pages 24-26. <br />Other capital programs, consisting of Major Infrastructure Rehabilitation Program and the <br />Equipment Replacement Program include capital projects/purchases that are administered by the <br />City of Eugene as part of its contractual responsibilities for MWMC. These programs provide <br />for major construction, repairs, and purchases necessary to maintain functionality, lifespan, and <br />effectiveness of existing facility assets and capacity. The proposed FY 03-04 budget for these <br />capital programs is summarized in Exhibit 3 below, and itemized on the page 27. <br />EXHIBIT 3 <br />REGIONAL CAPITAL PROGRAMS <br />DESCRIPTION FY 03-04 ADOPTED BUDGET <br />Biosolids -Poplar Plantation 5,700,000 <br />Biosolids -Dredge Movement System 150,000 <br />ElectroniaRecords & Storage ~ 50,000 <br />EBUWBI Flow Monitoring 135,000 <br />Pre-Design Study 600,000 <br />Total (Not Included in Operating Buget) $6,635,000 <br /> <br />Other Capital Programs (Eugene Operations) <br />Equipment Replacement $1,026,630 <br />Major Rehabilitation 182,000 <br />Major Capital Outlay 0 <br />Total (Not Included in Operating Budget) $1,208,630 <br />-- <br />Page 17 FY 03-04 BUDGET <br />