New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-03 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-03 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:49 AM
Creation date
6/1/2009 12:28:22 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission. Capital Improvement Program <br />alternatives. This budget is intended to fund administration, design and construction of an <br />expanded and remodeled laboratory. On February 7, 2002, the Commission executed a contract <br />with CH2M HILL for the lab expansion design and technical services during the construction <br />phase. The FY O1-02 capital improvement program budget has $1,200,000 allocated for this <br />project (administration, design and construction). Design is anticipated to be complete by the <br />end of FY O1-02 for an estimated cost of $150,000. Remaining funds will be carried over to FY <br />02-03. Construction is expected to begin early in the fiscal year and is expected to take about <br />nine months to complete. <br />Wet Weather Flow Management Plan (WWFMP) -Flow Monitoring <br />FY 02-03 Capital Budget = $190,000 <br />The WWFMP was initiated in the FY 97-98 CIP in response to Master Plan findings and <br />recommendations concerning the ability of the WPCF to handle peak wet weather flows. The <br />goal of the WWFMP was to determine the most cost-effective, feasible peak flow management <br />options to address regulatory and community concern"s. MWMC approved the WWFMP in <br />February 2001. In FY 00-01, the Commission approved an additional appropriation of $650,000 <br />- $400,000 to be used for the installation of two flow monitors for each major interceptor, <br />technical assistance to determine the best flow monitoring technology, and $250,000 for the <br />upgrade of the Glenwood pump station. <br />MWMC executed a $254,360 contract in October, 2001 for. flow monitoring equipment and <br />services. This contract will provide MWMC with three years of service to maintain and operate <br />the equipment. Flow data will be collected at three monitoring sites along the East Bank <br />Interceptor and three sites along the West Bank Interceptor. The data collected will enable staff <br />to evaluate the performance of the collection system improvements, and make refinements to the <br />regional hydraulic model used to simulate the collection system. FY 01-02 expenditures are <br />expected to be $210,000. The remainder of the funds will be carved over to FY 02-03. In 2005, <br />Eugene/Springfield staffwill need to begin providing maintenance and operation services for this <br />regionally purchased equipment. <br />The Glenwood pump station upgrade is tentatively scheduled to be rebudgeted in FY OS-06. This <br />project is being deferred for several years to enable further reconnaisance of the source of <br />excessive flows in the Glenwood drainage basin. <br />Plant Performance Improvements - Predesign Study (Formerly Peak Wet Weather Flow <br />Improvements) <br />FY 02-03 Capital Budget = $900,000 <br />The WWFMP identifies a 10-year program of specific capital improvements needed at the <br />WPCF to address peak wet weather flow conditions. These include upgrading the primary <br />treatment capacity to 263 mgd, upgrading the secondary treatment capacity to 130 mgd, and <br />expansion of outfall diffuser capacity. The total cost of these improvements is estimated by <br />CH2M HILL to be $33 million. In FY 99-00, $607,500 was budgeted for preliminary <br />design/engineering study improvements. Additional funding, in the amount of $1,392,500, was <br />approved in FY 01-02 bringing the total to $2,000,000 budgeted. This funding was to cover a <br />predesign study that would consider the appropriate sequencing of improvements and determine <br />whether other plant performance improvements could be cost effectively included. In addition to <br />the predesign, funds were included for the design of the Secondary Clarifier and Outfall Diffuser <br />Page 2E FY 02-03 BITDGET ' '. <br />
The URL can be used to link to this page
Your browser does not support the video tag.