New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-05 Regional Wastewater Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-05 Regional Wastewater Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:06:08 AM
Creation date
6/1/2009 12:28:11 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget & CIP
Document_Date
6/30/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECONDARY CLARIFIER ENHANCEMENTS <br />Facility Process Component <br />Secondary Treatment <br />$5,300,000 <br />' Total Cost <br /> PRIOR <br />Costs EXPEND- 2004-05 2005-06 2006-07 2007-08 2008-09 TOTAL <br /> ITURES <br />D <br />i <br />es <br />gn & Engineering 520,000 <br /> <br />Construction <br />4,780 000 520,000 <br /> <br />TOTAL <br />0 <br />5 300 000 <br />0 <br />0 <br />0 4,780;000 <br /> <br />FUNDING SOURCE 0 5 300 000 <br /> <br />Capital Reserve 3,074 <br />000 <br /> <br />Improvementment SDC Reserve , <br />2 226 <br />000 3,074,000 <br /> <br />TOTAL <br />0 , <br />5,300,000 <br />0 <br />0 <br />0 <br />0 2 226 000 <br />5,300,000 <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />PROJECT DRIVER <br />PROJECT TRIGGER: <br />TYPE OF PROJECT: <br />ESTIMATED PROJECT COST <br />(2004 Dollars): <br />PHASING: <br />Secondary Clarifier Enhancements Design and Construction <br />Baffle, add inlet energy dissipation, change out flocculation well, construct outboard <br />launder, and retrofit suction header for existing 8 clarifiers. <br />Enhancing the existing clarifiers will increase the secondary treatment capacity,. alleviate <br />current operational problems, and will maximize the facilities investment in existing <br />infrastructure. <br />Increase capacity of secondary treatment for base flows and for peak flows. Improve <br />effluent quality and pertormanc~ reliability to meet the current NPDES total suspended <br />Average secondary clarifier surface overFlow rates exceeding 750 gpd/sf or wet season <br />maximum month flows exceeding 80 mgd. . <br />50% Capacity; 50% Pertormance <br />$5,300,000 <br />Budgeted for FY 2004/05 <br />Page 65 FY 04-OS BUDGET AND C1P <br />
The URL can be used to link to this page
Your browser does not support the video tag.