THIRD GRAVITY BELT THICKENER <br />Facility Process Component <br />Secondary Treatment <br />$2, 570, 000 <br />Total Cost <br />Costs EXPEND- 2004-05 2005,06* 2006-07 2007-08 2008-09 TOTAL <br />tTURES <br />Design & Engineering 257,000 <br />Construction 257,0 <br />2 313,000 <br />TnTAi ~ .. ___ ___ 2.313.0 <br />F1INDING SOURCE '" """ ~ ~ 0 2;570,( <br />Capital Reserve 899,500 <br />Improvementment SDC Reserve 1 670 500 899" <br />TOTAL 0 0 2,570;000 0 1670,5 <br />0 0 2,570,0 <br />* Inflated from FY 04-05 costs at 2.8% per year (Engineering News Record factor) <br />PROJECT: Third Gravity Belt Thickener <br />DESCRIPTION: Third gravity belt thickener (GBT) with associated at grade building. Assumes additional <br />basement floor space is not required. <br />JUSTIFICATION: Provides additional capacity for WAS thickening and potentially delays the construction of <br />additional digesters. <br />PROJECT DRIVER: Additional capacity to provide WAS thickening with one unit offline at WWMW upper limit <br />flow projections. Nitrification required by the NPDES permit and increasing wastewater <br />flows and loads generates more WAS solids. Provide ability to conduct recuperative <br />thickening so that need for additional digestion volume can potentially be deferred. <br />PROJECT TRIGGER: Exceeding solids and hydraulic loading rate design criteria. <br />TYPE OF PROJECT: 100% Capacity <br />ESTIMATED PROJECT COST $2,500,000 <br />(2004 Dollars): <br />INFLATED PROJECT COST $2,570,000 <br />(2005 Dollars): <br />PHASING: Budgeted for FY 2005/06 <br />Page 60 FY 04-OS BUDGET AND CIP <br />