New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-05 Regional Wastewater Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-05 Regional Wastewater Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:06:08 AM
Creation date
6/1/2009 12:28:11 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget & CIP
Document_Date
6/30/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Eugene Budget Detail <br />special project activities of the Wastewater Division. The laboratory's services include <br />sample handling and analyses of influent sewage, treated wastewater, biosolids, <br />'~ industrial wastes, stormwater, and groundwater. Information from the laboratory is <br />used to make treatment process control decisions, document compliance with <br />~~ regulatory requirements, demonstrate environmental protection, and ensure worker <br />j ', health and safety. <br />The Sampling Team is responsible for all of the sampling activities related to regional <br />wastewater program functions. These include the Eugene pretreatment program, <br />wastewater treatment process control, effluent and ambient water quality, groundwater <br />quality, facultative sludge lagoons, and stormwater samples. This section also <br />evaluates and reports on the sampling data for various programs. <br />MANAGEMENT INFORMATION SERVICES (MIS) <br />The MIS section provides services for electronic data gathering, analysis, and reporting <br />as necessary, in compliance with regulatory requirements and management functions. <br />This section also maintains the electronic communication linkages with the City of <br />Eugene and the Regional Information System, and supplies technical expertise and <br />assistance in the selection, operation, and modification of computer systems (hardware <br />and software) within the Division. <br />PROJECT MANAGEMENT <br />Management of wastewater system improvements and ongoing developments is carried <br />out by the Project Management staff. Activities include problem-solving and action <br />recommendations, project management, technical research, computer-aided design and <br />electronic storage of design drawings, and planning of projects to'anticipate and prepare <br />for new regulatory and operational requirements. The Project Management staff <br />develops Request for. Proposals and Request for Quotes; .coordinates special project <br />activities between work sections, and coordinates the procurement of building permits as <br />necessary in support of project activities. <br />r <br />', <br />Page 43 FY 04-OS BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.