Metropolitan Wastewater Management Commission Capital Improvements Program <br />EXHIBIT 9 <br />CAPITAL PROGRAMS <br />5 YEAR PLAN <br />Capital Improvements Program (ClP) FY 04-05 FY OS-06 FY 06-07 FY 07-08 FY 08-09 TOTAL <br />(~prmgtietu Aanumstration) <br />- Biosolids Management <br />Biosolids -Poplar Plantation 2,100,000 2,100,000 <br />Biosolids -Poplar Plantation II 308,400 308,400 <br />Biocycle Farm Hose Reels 267,280 267,280 <br />Biosolids -Poplar Plantation III 325,912 325,912 <br />Biosolids -Composting <br />Biosolids -Dredge Movement System <br />Biosolids -Line Lagoons I 1,268,141 1,268,141 <br />Biosolids -Line Lagoons II 1,228,472 1,228,472 <br />Non-Process Facilities <br />Lab Modification 45,000 45,000 <br />River Avenue Improv. 339,240 339,240 <br />Plant Performance Improvements <br />WWFMP Update 257,000 257,000 <br />Support Private Lateral Program 257,000 257,000 <br />- Wilakenzie Pump Station Expansion 6,340,704 6,340,704 <br />Glenwood Pump Station Upgrade 543,187 543,187 <br />2004 Facilities Plan 200,000 200,000 <br />Inffluent Pumping Improvements 1,796,533 1,796,533 <br />' Dry Weather Headworks 13,905,587 13,905,587 <br />Primary Clarifier Enhanc. 1,200,000 1,200,000 <br />Primary Sludge Thickening 3,910,946 3,910,946 <br />Engine Generator -Digester Gas Filter <br />Digester Mixing Imp.Design 200,000 200,000 <br />Digester Mixing Imp. 1,800,000 1,800,000 <br />', 3rd Gravity Belt Thickener 2,570,000 2,570,000 <br />Odorous Air Treatment I 2,364,400 2,364,400 <br />South Aeration Basin Imp. Design 690,000 690,000 <br />South Aeration Basin Imp. Design 6,210,000 6,210,000 <br />Parallel Primary /Secondary Treatmen 12,150,113 12,150,113 <br />Secondary Clarifier Enhanc. Design 520,000 520,000 <br />Secondary Clarifier Enhanc. Design 4,780,000 4,780,000 <br />9th & 10th Secondary Clarifiers 6,657,739 6,657,739 <br />Sodium Hypochlorite Conversion 4,454,133 4,454,133 <br />Tertiary Filtration Design 1,000,000 1,000,000 <br />Effluent Reuse I 2,641,960 2,641,960 <br />' Outfall Mixing Zone Study 154,200 154,200 <br />Construction Management Facilities 100,000 100,000 <br />SUB-TOTAL 17,845,000 14,654,757 22,717,953 24,139,765 13,948,737 93,306,213 <br />Other Capital Programs (Eugene Operations) <br />Equipment Replacement 2,004,541 1,161,587 472,553 1,136,011 1,702,488 4,774,692 <br />Major Rehab 350,000 252,000 362,610 596,374 765,000 1,560,984 <br />Major Capital Outlay 250,000 216,800 219,183 466,800 <br />SUB-TOTAL 2,604,541 1,630,387 835,163 1,732,385 2,686,671 9,489,147 <br />TOTAL 20,449,541 16,285,144 23,553,116 25,872,150 16,635,408 102,795,360 <br />__ <br />i.' <br />~', Page 32 FY 04-05 BUDGET AND CIP <br />