New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-05 Regional Wastewater Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-05 Regional Wastewater Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:06:08 AM
Creation date
6/1/2009 12:28:11 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget & CIP
Document_Date
6/30/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvements Program <br />OTHER CAPITAL PROGRAMS <br />• Equipment Replacement <br />The FY 04-OS Capital Programs budget includes the Equipment Replacement projects identified in <br />the table below. <br />Equipment Replacement Projects - FY 04-05 <br />Project Description Adopted Budget <br />Raw Sewage Pumps (2) 200,000 <br />Field Control Units for Distributive Control System 480,000 <br />Inductively Coupled Plasma Unit 100,000 <br />Pressure Line Gates 33,000 <br />Plant Electrical System 720,829 <br />Activated Sludge Pump 25,000 <br />Boiler Controls 45,000 <br />Phone System 56,044 <br />Computer Replacement 30,568 <br />Fleet Replacement 314,100 <br />Total $2,004,541 <br />• Major Rehabilitation <br />The FY 04-OS Capital Programs budget includes the Major Rehabilitation projects identified in the <br />table below. <br />Major Rehab Projects - FY 04-05 <br />Project Description Adopted Budget <br />Screw Pump Coating 120,000 <br />Secondary Clarifier Floor Coating 85,000 <br />Raw Sewage Pump Room Roof Replacement 30,000 <br />Operations Building Upgrade 50,000 <br />Primary Building Roof Replacement 25,000 <br />Parking Lots & Roadways Asphalt Sealing 40,000 <br />Total $350,000 <br />Page 30 FY 04-OS BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.