New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-05 Regional Wastewater Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-05 Regional Wastewater Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:06:08 AM
Creation date
6/1/2009 12:28:11 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget & CIP
Document_Date
6/30/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget and Program Summary <br />Staffing <br />The Springfield Personnel Services budget includes $357,790 to fund the addition of two Civil <br />Engineers, a Construction Inspector II (mid-year), and an Engineering Assistant needed to <br />coordinate the design and construction of new capital projects, a Clerk II needed to implement <br />the electronic data storage project and an Accountant at .65 FTE to provide financial support to <br />these efforts. This 5.65 FTE increases Springfield RWP staff from 8.4 FTE to 14.05 FTE (a <br />49% increase). <br />Regular Wages - $732,670 [Increase of $278,242 or 61%] <br />This category reflects $241,890 in regular wages associated with the addition of two Civil <br />Engineers, a Construction Inspector II (mid-year), an Engineering Assistant, a Clerk II <br />and an Accountant at .65 FTE. These new positions will account for 87% of the increase. <br />in regular wages. <br />• Salaries for FY 04-OS increase by 2.5%, per contract agreement between the City of <br />Springfield and the local union (OPEU). The additional increases are from annual merit <br />increases and funds necessary to pay end-of-service liabilities for personnel anticipating <br />retirement in FY 04-05. <br />Employee Benefits - $288,732 [Increase of $141,956 or 97%] <br />• The addition of 5.65 FTE accounts for $115,600 (or 82%) of this increase. <br />• PERS rates will not change for FY 04-OS <br />• Health Insurance cost increases make up the bulk of the remaining change,in costs. <br />While rates have increased for FY 04-05, the City of Springfield transitioned to a new <br />health insurance program beginning January 1, 2004. It is anticipated this change will be <br />less expensive over the long term. <br />Materials and Services <br />The proposed Materials and Services budget represents a total FY 04-OS increase of $433,415 <br />(or 36%). The major changes are in the following budget categories: <br />Contractual Services - $188,439 [Increase of $120,300 or 177% over original FY 03-04 <br />budget; 100% increase over the amended FY 03-04 budget] <br />• The FY 03-04 Contractual Services budget was amended to appropriate an additional <br />$25.,840, in order to transfer the regional flow monitoring contract from the CIP to the <br />Operating Budget. This contract will continue in FY 04-OS with a projected budget <br />increase of about $2,200. Other significant increases in the FY 04-OS Contractual <br />Services budget are $25,000 for contracted data imaging services, a $5,500 increase in <br />Page 13 FY 04-OS BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.