r. _ r <br /> ~ 1. _ - _ <br /> _ <br /> ~ . ._._a ~ , <br /> ` b.,~ w._ ~.,.......W 1 <br /> APO <br /> See page 20 for definitions ~ <br /> Implementation Plan oQ~ z~ y~~~ <br /> y~ a`p o`` <br /> <br /> Skinner Butte Park Master Plan ACTION ACTION VOL. POSSIBLE COST <br /> PRIORITY TYPE OPPS. NOTES PROJECT STAGES TIMELINE FUNDS ESTIMATE j <br /> 1. Expand the H7 Habitat Management Unit to cover the area of the S4 Special Management Unit <br /> 2. Consider adaptive re-use of remaining structures for a continuation of the park host function other park functions such as picnic shelters, interpretive centers, etc. <br /> 3. in <br /> :the absence of funding or need for adaptive re-use, consider the removal of structures, roads and utilities for habitat restoration and further expansion of the H7 Habitat Management <br />Unit 4. Allow <br /> :developed parking area to remain, or consider the addition of a small (10-space) parking and entrance kiosk for the habitat restoration area and access to the Greenway and riverbank <br />path system j <br /> i <br /> C LAMB COTTAGE: Re-vitalize Lamb Cottage and <br /> 4'•5 surrounds to support group events and provide an <br /> anchor for the Skinner Butte Promenade <br /> i <br /> A. Enhance Lamb Cottage as the river-side terminus of the See Draft Master Plan drawing for <br /> Skinner Butte Promenade. 2 POL conceptual guidelines <br /> I <br /> B. pF ~elop expanded outdoor terraces south of Lemb Cottayo to See Draft Master Plan drawing for <br /> prvide breaf~-out spare for events 3 I conceptual guidelines 2010 TBD $75,000 <br /> C, Design and construct a new path system to provide a clear See Draft Master Plan drawing for <br /> connection from the ri erhank bike path tc the Skinner butte conceptual guidelines <br /> i~romenadc around Lamb Cotta ae and [he outdoor t~:rraces 3 I * * * * 2010 TBD $30,000 <br /> D. lJse native planting in a formal .vay~ around Lamb Cottage to See Draft Master Plan drawing for <br /> demonstrate the use of native plants in a residential setting 2 I * conceptual guidelines ~ ~ * 2010 TBD $20,000 <br /> .(See Acfion •t_7) - <br /> 4.6 OPEN SPACE: Designate adequate open space within the <br /> V park ~1 <br /> A. Areas that remain open as recommended by this master plan See Draft Master Plan drawing for <br /> are intended to remain open and free of obstructions such as conceptual guidelines I <br /> trees, fences, parking, built structures or other physical <br /> elements to preserve the sense of space, provide relief from 1 POL immediate <br /> the urban environment and create a variety of experience <br /> i <br /> i <br /> LANDSCAPE AND IRRIGATION: Address general <br /> 4'•7 condition, maintenance and development of landscape <br /> areas throughout the park. <br /> A. Identify, designate and enhance certain, significant areas of See Management Unit Descriptions <br /> traditionally maintained lawn and omamental gardens for 1 POL <br /> informal park activities, community events, private functions, <br /> etc. <br /> i <br /> B. Design and construct rc novation of the outdoor infrastructure Consider stone walls, omamental planters <br /> of the Campbell Senior Center to accommodate and promote and pots, high-quality Stone or <br /> the use of the area for private social functions such as 1 I manufactured paving, light standards, * * * * 2002 BOND, TBD $5,000 <br /> weddings, reunions, anniversana~s, graduations, etc. garden structures and park furniture <br /> C. Design and construct planting area renovations with an Consider involvement of seniors and <br /> ornamental and floral display theme for enhancement of 3 I * other CSC-user groups with plant * * * 2010 TBD $75,000 <br /> existing punting and floral garden areas. interests <br /> Implementation Plan 9 of 20 January 2002 <br /> <br />