New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EWEB/New Triad Hospital Relocation Transportation Analysis Report
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
EWEB/New Triad Hospital Relocation Transportation Analysis Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 11:35:15 AM
Creation date
6/1/2009 12:27:13 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Transportation
PW_Subject
Transportation Analysis
Document_Date
6/30/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AVENUE A THROUGH RIVERFRONT RESEARCH PARK <br />2004 2010 ESTIMATE OF PROBABLE CONSTRUCTION COST <br />Roadways, Drainage, and Bridge Structure <br />SUMMARY <br />--. `t <br />/~' <br />SECTION <br /> <br />Avenue A through Riverfront Research Park <br />City <br />Eugene <br />KIND OF WORK <br />Street Improvements/Drainage/Utility Relocation KEY NUMBER LENGTH DATE <br />5 /2 512 0 0 4 PREPARED BY <br />Andy Kutansky <br />Description: Roadway and Bridge Structure <br />B.I. ITEM .UNIT AMOUNT UNIT <br />COST TOTAL O <br />K COMMENTS <br />RO ADWAY <br /> AVENUE A <br /> MOBILIZATION LS 1 $170,000 $170,000 <br /> ROADWAY Ls 1 $1,363,148 $1,363,148 <br /> sioewALtc Ls 1 $122,500 $122,500 <br /> ILLUMINATION LS 1 $108,000 $108,000 <br /> ROADWAY SUBTOTAL $1,763,648 <br />DRA INAGE <br /> AVENUE A <br /> DRAINAGE-SURFACE WATER LS 1 $242,000 $242,000 <br />BRI DGE STRUCTURE <br />AvENDE A LS 1 $700,000 $700,000 <br />ESTIMATE OF PROBABLE CONSTRUCTION COST <br />CONSTRUCTION CONTINGENCY @ 40% 1 <br />TOTALfSTIMATE OF PROBABLE CONSTRUCTION COST <br />ENGINEERING DESIGN @ 12% $454,548.81 <br />CONSTRUCTION MANAGEMENT@ 15% 1 $568 186.01 <br />TOTACPROJECT CONSTRUCTION COST <br /> <br />RIGHT OF WAY COST <br />AVENUE A RIGHT OF WAY $262 500 <br />TOTACESTIMATED PROJECT COST <br />Avenue A Roadway Bridge 2004 Cost Summary 060904 1 6/15/2004, 4:11 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.