New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Final Environmental Impact Statement - New Federal Courthouse
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Final Environmental Impact Statement - New Federal Courthouse
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 8:07:39 AM
Creation date
6/1/2009 12:26:26 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Environmental Impact
Document_Date
12/31/2000
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Comments and Responses, September 26, 2000 Public Hearing in Eugene <br />Transcript 1 <br />1 A second site wa8 eel8ctatl which Mao the City <br />2 of Eugene city haft. An agreement could not bo ranched with <br />S the City and thot silo was withdrawn. Me started the Mattonal <br />4 Environmental POIicY Act. environmental process spats Lhto <br />5 spring and d811naated aroA8 to inCludo the C7ty of 8prinpflold. <br />d Initially, wo lied 22 altos that we lOOkod at and <br />T that list wee pntred down CO flue attornatlvoa. Tho alto <br />8 number one 1a the rtvar front alto locatod in 8prin9fiold. And <br />9 that is about 8.1 acroe. <br />t0 Site number alternative two, for Chiouita, or <br />11 tho former A9ripee alto, is located in Eugene. Tha alto is <br />t2 bordered by 8th Avenue. Mill and the railroad tracks. This <br />1S site covers Wino acroo but Me would not have to take th0 entire <br />14 ails for the courthouse. <br />l5 stu alternative throe. sailed the Oataway site. <br />15 is located in Springfield across the etreot frost the Sony diet <br />17 factory. Bite number four fa located at EMEB and which to <br />18 IOCSLetl in Springfield. The •1te Of the proaonL EYgenO Mater <br />19 and Electric Board end fa bortlored by 4th Avenue. Millamette. <br />20 Mtlyerd and railroad tracks and M19h Stroot. Tho alto eontalna <br />21 18.0 setae. Chet r+a would not be taking that whole lot and wo <br />22 would look at a site neat or west of the Ferry Stroot Bridge. <br />22 Site number five is also in Eu9one and is <br />24 located -- tt bordorod by Milyar0 etraot, Broad Stroot (sic), <br />2b Mtii 6Lreot and Bth Avenue and the onetern border of tha site <br />3 <br />Transcript 1 <br />4 <br />1 is formed by the western property line of the Johannaon <br />2 Aoartmenta and the Henor Motel. Tho site contains 2.a scree. <br />3 Now, I'm going to oak John to ta1K to you more <br />4 about the environmental process. <br />5 MR. MEERSCHEIDT: Moll. tho purpoSO of a public <br />6 hearing aftor issuing a draft of an Environmontai Impact <br />7 8tetement to to onCOUrago COnt1nWO OtlD11C part/clpation 1n tho <br />8 onvlronmontal procoea. Many of you worn bore onrtior this your <br />9 for th8 public (fleeting for the BCOpin9 prdCe9a and now 1h18 is <br />10 a continuation, this ie continuod public particfpetlon. <br />1/ The public hearing allows members of the public <br />i2 to state Por the record their evaluation of the protect, their <br />13 Oveluation of the altarnativoa and also an ovaluetion of the <br />14 analysis contained to the environmental document. <br />1S Tho lnformatlon presented at a public hoaring <br />16 rosy load to n modification of the altornntlvaa, development and <br />iT evaluation of new nlternativea. a modification of the <br />16 enVtronmontel analyai6 antl a correction of faCLUai errors. <br />i9 So tonight, you will have the opportuniLY Lo <br />20 sneak and pracont your analyeia of th0 alternatives and the <br />2t onvtronmentel document and we encournge you to do so. <br />22 If you do not w18h to spook tonight, we will <br />23 accept Nrittan comments until October 29th. 2000. And this ie <br />24 a change from what is stated in the Environmental Impact <br />25 Statement. Thorn the data is glues as October 20th. Mo'va <br />New Federal Courthouse 203 Final EIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.