Comments and Responses-Letter 8 <br />S.5-Construction activities would <br />be restricted to normal construction <br />hours (7 a.m. to 7 p.m.). After <br />construction is complete, the <br />federal courthouse would operate <br />during normal business hours (8 <br />a.m. to 5 p.m.), and its operations <br />would not exceed local, state, or <br />federal noise standards. The <br />proposed project is not expected to <br />result in noise levels that would <br />affect nearby residents. <br />Construction may generate dust <br />during land clearing activities and <br />demolition of existing structures on <br />the site. Airborne dust would be <br />minimized through implementation <br />of best management practices <br />during construction. The proposed <br />project is not expected to result in <br />any health impacts on neighbors or <br />any adverse impacts on the nearby <br />park or wildlife. <br />(Lstter8) <br />8.5 HF4c7ri ~4Qt~Mf CY.ilA) 7?/< lttiY!!, iLVr dti..ti » JY.rc>, an) tYf. daX. /l,~JY <br />conU. <br />d~ ctr, ~nclud.nf .4k ~~ar~c. <br />7e+ Ji/eRT, '7NP.P? ,6tt saa<.te. oTx.,e snr~ ,arau..asu ,at r~r n~.,er~xvx <br />TbNT L~.n.c:o lour zvdah: ~ fitc tilt Of/TX4cTiO.V~ p4A.!! .ine enddlr0 <br />B.,to ail.-. <br />siN~e,F.e.-Y~ <br />CCi.~7.e-C ~ta.e.~.J <br />C~Qdc. Srea,u <br />JE 9 u+. 8 r , <br />S~iC~N9~Nd o x' 97Y77 <br />~nG: d.<o utt <br />ct: maesa. s.e token <br />New Federal Courthouse 179 Final EIS <br />