Figures <br />Figure 1. Sites identified for Alternatives 1 and 2 in Eugene and Springfield, Oregon ..............24 <br />Figure 2. Vicinity map of the Alternative 1 site in Springfield, Oregon .....................................25 <br />Figure 3. Alternative 1, options A and B, the Riverfront site in Springfield, Oregon ................26 <br />Figure 4. Vicinity map of the Alternative 2 site in Eugene, Oregon ...........................................28 <br />Figure 5. Alternative 2, options A and B, the Chiquita (formerly Agripac) site in <br />Eugene, Oregon ............................................................................................................29 <br />Figure 6. Preliminary siting of federal courthouse building for the alternatives ........................30 <br />Figure 7. Major seismic events in Oregon ..................................................................................42 <br />Figure 8. Approximate 100-year and 500-year floodplain boundaries for each of the <br />alternative sites .............................................................................................................46 <br />Figure 9. Locations of selected photographic viewpoints for Alternatives 1 and 2 ....................77 <br />Figure 10. Existing view of the Alternative 1, option A site from viewpoint #1, compared <br />with photographic simulation of proposed courthouse on the site ..............................78 <br />Figure 11. Existing view of the Alternative 1, option A site from viewpoint #2, compared <br />with photographic simulation of proposed courthouse on the site ........................... ...79 <br />Figure 12. Existing view of the Alternative 1, option B site from viewpoint #1, compared <br />with photographic simulation of proposed courthouse on the site ........................... ...80 <br />Figure 13. Existing view of the Alternative 1, option B site from viewpoint #2, compared <br />with photographic simulation of proposed courthouse on the site ........................... ...81 <br />Figure 14. Existing view of the Alternative 2 site, options A and B, from viewpoint #3, <br />compared with photographic simulation of proposed courthouse on the site ..............83 <br />Figure 15. Existing view of the Alternative 2 site, options A and B, from viewpoint #4, <br />compared with photographic simulation of proposed courthouse on the site ..............84 <br />Figure 16. Zoning in the proposed project area of the Riverfront site (Alternative 1) in <br />Springfield, Oregon .................................................................................................... 123 <br />Figure 17. Zoning in the proposed project area (for Alternative 2) in Eugene, Oregon ............. 124 <br />Figure 18. Locations of utility lines for the Riverfront site (Alternative 1) <br />in Springfield, Oregon ............................................................................................... 138 <br />Figure 19. Locations of utility lines for the Chiquita (formerly Agripac) site <br />(Alternative 2) in Eugene, Oregon ............................................................................. 139 <br />xi <br />