City of Eugene Road Fund Expenditures on Regional Road Network -- Page 2 <br />FY97 <br />East 11th (Kincaid-High) reconstruct. $239,783 RRN <br />FSB reconstruct $167,131 RRN <br />Amazon Parkway/ Coburg Road <br />(Beltline-Kinney) overlay $462,160 RRN/RRN Transfer <br />11th Avenue (Franklin-Pearl) reconstruct $573,038 RRN <br />13th Avenue (Adams-Washington) reconstruct $126,928 RRN <br />Construction subtotal $1, 569, 040 <br />Regional system O&M estimate* $1,250,000 <br />FY97 Subtotal $2,899,040 $2,690,000 <br />Total $8,961,514 $7,540,000 <br />"Operations and maintenance estimate based on approximately $15, 000 per mile for approximately 82.5 miles of <br />regional road network and other transferred roadways operated and maintained by the: city of Eugene. The cost per <br />mile was derived by dividing the total number of road miles in Eugene (484) into the city's road fund operating budget <br />for FY01. It appears a similar figure would be derived by using the total road miles in Lane County and the .county's <br />road fund operating budget. <br />** Road Designations: RRN =Roads in Eugene designated Regional Road Network (45.1 miles); RRN Transfer = <br />Regional Road Network transferred from County to City (10, 6 miles); and Other Transfer =Other County Road <br />Transfers (39.9 miles), for a total of 95.6 miles, of which 82.5 miles are Eugene's responsibility to operate and maintain <br /> <br />