<br />AS Service Systems <br />interior distribution Replace (3) 4' 2-lamp fluorescent fixtures with new F32T8 zero-degree $938 <br />fixtures. 0 <br />Service Systems $938 <br />Totals For -Existing Deficiencies (requiring correction at time of audit) $938 <br />Emerging Deficiencies Requiring Correction Within 5 Yrs <br />A3 Primary Building Systems <br />metal roofing Replace (or paint) roof in future. <br />$112,320 4 <br />general ext painting Paint overhead door sheet metal enclosures <br />$3,250 2 <br />general ext painting paint plywood panels between doors <br />$1,500 2 <br />general ext painting paint fascia and gutter <br />$375 2 <br />Primary Building Systems $117445 <br />Totals For -Emerging Deficiencies Requiring Correction Within 5 Yrs <br />$117,445 <br />PW Maintenance -Roosevelt <br />Date Printed 78-Feb-02 <br />VI=43 <br />