<br />A3 Primary Building Systems <br />steel siding Install bollards to protect structure $3,750 1 <br />wood siding Replace dry rot areas at dock, install timber bumper to protect $3 500 1 <br />general ext painting Paint wood beams, posts along north elevation $1 <br />875 <br /> , 1 <br />plywood siding Paint shed (north east of dock) $781 <br /> 0 <br />steel siding Repair siding damage on northwest corner $313 1 <br />gutters & Install downspout to drain at NE corner $188 1 <br />downspouts <br />. Primary Building Systems $10,406 <br />A5 Service Systems <br />interior distribution West bay -replace the lighting switch, switch box, and cover plate with a $250 0 <br />-new switch and weather proof box and cover plate. <br />Service Systems $250 <br />Totals For - E~sting Deficiencies (requiring correction at time of audit} $10,656 <br />Emerging Deficiencies <br />uiring Correction Within 5 Yrs <br />A3 Primary Building Systems <br />metal roofing Fairly corroded, replace (or paint) in future <br />$65,600 4 <br />Primary Building Systems $65,600 <br />Totals For -Emerging DeFciencies Requiring Correction Within 5 Yrs $65,600 <br />PW Maintenance -Roosevelt Date Printed 18 Feb-o2 <br />VI-37 <br />~ Existing Deficiencies (requiring correction at t»„P ~f ~»~~+~ <br />