New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:26:03 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Miscellaneous
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />interior air quality Provide ventilation <br />A3 Primary Building Systems <br />$1,250 4 <br />Health Safety and Welfare $1,250 <br />metal roofing replace roofing $24,000 2 <br />steel siding Install bollards to protect building at bays $2,500 2 <br />steel siding Repair damaged siding, southeast corner $375 2 <br />Primary Building Systems $26 875 <br />A5 Service Systems <br />overall plumbing Replace domestic water system $3,125 2 <br />system <br />heating system Replace old unit heaters with new $1,875 4 <br />plumbing shut-off Replace shut-off valves $313 3 <br />valves <br />Service Systems $5,313 <br />Totals For -Emerging Deficiencies Requiring Correction Within 5 Yrs $33,438 <br />PW Maintenance -Roosevelt Date Printed ]8-Feb-o2 <br />VI-34 <br />Al Health Safety and Welfare <br />
The URL can be used to link to this page
Your browser does not support the video tag.