Existing Deficiencies (req <br />Al Health Safety and Welfare <br />seismic resistivity Study structural <br />correction at time of audit) <br />~~ ^~~ <br />Health Safety and Welfare <br />A3 Primary Building Systems $6,250 <br />metal roofing Replace metal roofing <br /> $81,600 <br />gutters & Replace gutters and downspouts <br />downspouts $8,160 <br />steel stuctural <br />' Install bollazds to avoid damage to structure <br /> <br />system . <br />$7,500 <br />metal roofing Refraining maybe required -study structural system ` <br />$6,250 <br />steel stuctural Repair damaged connections to footings between bays <br /> <br />system . <br />$6,250 <br />steel siding Repaint exterior <br /> $5,625 <br />wood siding Paint miscellaneous exposed wood. <br /> $1,250 <br />doors, exterior Paint exterior doors <br />wood $1,000 <br />Primary Building Systems $117,635 <br />A4 Secondary Building System <br />interior wall paint Paint interior walls <br />Q~ ~~~ <br />Secondary Building System $7 969 <br />AS Service Systems ' <br />phone/data cable Exterior west wall and between bldg 4 & 5 -remove unused loose cables <br />mgmnt and secure the remaining cables $250 <br />Service Systems $250 <br />PW Maintenance -Roosevelt <br />Date Printed 18 Feb-02 <br />1 <br />0 <br />0 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />VI-19` <br />