A3 Primary Building Systems <br />gutters & Replace gutters and downspouts <br />downspouts <br />metal roofing Refrazning mayb a required -study structural system <br />metal roofing Refraining mayb a required -study structural system <br />metal roofing <br />A4 Secondary Building System <br />resilient flooring Install flooring/wainscot room 009 <br />acoust. tile'ceilings Repair droopy ceiling room 005 <br />A5 Service Systems <br />r <br />$9,120 p <br />Primary Building Systems <br />Secondary Building System <br />plumbing fixtures Room 012 & 014 -replace showers. Non-ADA compliant, hazardous. <br />general lighting Room 006 - Same as for Room 005 excpet w/4-lamp fixtures. <br />general lighting Room 005 -Remove existing lighting fixtures and replace them with (4) 2- <br />lamp 4-foot F32 T8 fixtures. <br />plumbing backflow Vacuum breakers needed on exterior hose bibbs - neaz room 001 <br />phone/data cable East exterior wall -secure cables at appropriate intervals ' <br />mgmnt <br />$6,250 <br />$6,250 <br />1 <br />1 <br />0 <br />~L 1,VLV <br />$1,750 1 <br />$313 1 <br />$2,063 <br />$3,750 0 <br />$1,000 1 <br />$750 1 <br />$500 0 <br />$63 1 <br />Service Systems $6,063 <br />Totals For -Existing Deficiencies (requiring correction at time of audit) $29,745 <br />PW Maintenance -Roosevelt Date Printed 18-Feb-O2 <br />VI-15 <br />~ existing Deficiencies (requiring correction at time of auditl <br />