New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:26:03 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Miscellaneous
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing Deficiencies (requiring correction at time of audit). <br />Al Health Safety and Welfare <br />interior air quality Room 030 requires exhaust system (for vehicular exhaust) $31,250 1 <br />interior air quality Room 053 requires exhaust/ventilation (none existing) $1,250 1 <br />Health Safety and Welfare $32,500 <br />A3 Primary Building Systems <br />built-up roofing Reroof built-up roofs (bare ares and large blilsters) $70,875 1 <br />doors, exterior Replace wood windows in roof monitors $9,375 0 <br />wood <br />doors, exterior Replace wood wondows on west elevation $8,000 1 <br />wood <br />doors, exterior Paint doors and frames $2,831 1 <br />metal <br />built-up roofing Clean out and repair roof drains $2,500 0 <br />plywood siding Paint plywood siding $2,344 0 <br />general ext painting Paint wood at covered area outside of room 027 $1,500 1 <br />doors, exterior Replace wood door and threshold to room 031 $750 0 <br />wood <br />composition Remove roof moss $625 0 <br />roofing <br />built-up roofing Remove roof moss $625 0 <br />doors, exterior Clean windows on east wall $469 0 <br />wood <br />doors, exterior Paint roll up door to 027 $438 1 <br />metal <br />awnings & flames Replace broken light facture cover at west side $250 1 <br />PW Maintenance -Roosevelt Date Printed 18 Feb-02 VI-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.