New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:26:03 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Miscellaneous
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADMINISTRATION SUPPORT: <br /> • Provides administration support to all operations <br /> • Manages payroll functions <br /> Oversees personnel records <br /> • Provides data entry <br /> ~ Handles purchasing functions and billing activities <br /> Prepares and administers budget <br /> • Provides clerical support <br /> • Provides the support functions to the Parks and Open Space Division <br /> I!, 8.5 FTE are assigned to this work unit (7 funded by PWM, 2 funded by POS) <br /> i <br /> SURFACE TECHNICAL TEAM <br /> • Administers right-of-way programs <br /> • Administers pavement management program <br /> • Supports planning for infrastructure management <br /> • Administers small maintenance contracts <br /> Operates and maintains tools and supply stockroom <br /> Provides on-site network and computer technical support for Maintenance Division <br /> • 8 FTE are assigned to this work unit <br /> <br /> is <br /> SURFACE MAINTENANCE <br /> • Oversees maintenance of 616 miles of sidewalks and pedestrian ways <br /> • Maintains all concrete curb and gutter <br /> • Maintains over 5,810 sidewalk access ramps <br /> • Maintains and repairs concrete alleys, streets, bicycle paths, storm basins, and inlets <br /> Builds and maintains emergency barricades and bike path bollards <br /> • Maintains 489 miles of paved street surfaces <br /> • Maintains 30 miles off street and 89 miles on street bike paths, 5.5 miles of pedestrian ways <br /> • Performs fall leaf pickup <br /> - Performs winter road sanding and snow removal <br /> • 17 FTE are assigned to this work unit <br /> TRAFFIC OPERATIONS SECTION: <br /> Traffic Operations includes three work units with focus on safety, right-of-way management, and <br /> maintaining, enforcing, administering and providing the technical support to the traffic <br /> infrastructures systems. They are as follows: <br /> SAFETY COORDINATION <br /> Administers safety program for the Roosevelt Yard (PWM & POS) <br /> - 1 FTE <br /> TRAFFIC MAINTENANCE <br /> • Maintains approximately 25,701 traffic signs <br /> • Maintains 13,000 feet of guardrail <br /> • Maintains all yellow curbs, lane markings, crosswalks, on-street parking stalls, and 480 lane- <br /> miles of striping <br /> • Parking meters; performs new installations and removals as necessary <br /> • Installs traffic signs and pavement markings for new streets <br /> Facilities Master Plan -January 2004 <br /> III - 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.