Existing Deficiencies (requiring correction at time of audit) <br />A4 Secondary Building System <br />interior flatwork patch minor defects and.seal concrete floor <br />$250 1 <br />Secondary Building System $250 <br />Totals For - Ezisting Deficiencies (requiring correction at time of audit) $250 <br />Emerging Deficiencies Requiring Correction Within 5 Yrs <br />A3 Primary Building Systems <br />steel siding puul out minor dents in siding and paint. ,$500 4 <br />Primary Building Systems $500 <br />~__ <br />Totals For -Emerging Deficiencies Requiring Correction Within 5 Yrs $500 , <br />PW Maintenance -Roosevelt Dare Printed 18 Feb-o2 ~7I-65 <br />