Existing Deficiencies (requiring correction at time of audit) <br />A3 Primary Building Systems <br />doors, exterior Install new doors and hardware to #006 & #001 $3,500 1 <br />metal <br />wood floor Sutdy soft (dnagerous?) floor area in room #010, repair. $1,875 0 <br />structure <br />doors, exterior Replace door hardware and glazing room #003 (west) $1,063 1 <br />metal <br />metal roofing Clean metal roofing and gutters $500 0 <br />general ext painting Paint misc. wood trim $438 ' 1 <br />general ext painting Paint wood entry cover and posts $375 1 <br />general ext painting Paint overhead door $313 1 <br />Primary Building Systems $8,063 , <br />A4 Secondary Building System <br />carpet Replace carpet/base room 008 and 010 $2,400 1 <br />int Add non slip using to treads $625 1 <br />handrails/guardrails <br />Secondary Building System $3,025 <br />AS Service Systems <br />air distnbution Provide HVAC for rooms 008, 010, 009 $6,250 0 <br />fire sprinkler piping Remove abandoned fire sprinkler piping $2,500 1 <br />phone/data cable South exterior wall -disconnect cables housed in 3" conduit that has $2,500 0 <br />mgmnt separated from its couplings, replace the 8' of 3" condiut and fittings, repull <br />and reconnect the cables. <br />ventilation Remove abandoned spray booth exhaust fan $1,875 1 <br />components <br />PW Maintenance -Roosevelt Date Printed 18-Feb-o2 VI-58 <br />