New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2008-13 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2008-13 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:18:55 AM
Creation date
6/1/2009 12:25:42 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
3/12/2007
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater Funding Secured <br />Stormwater Rehabilitation and improvements <br />Willamette River Bank Stabilization Study <br />Project Description: Study to determine the extent and severity of bank failures along the Willamette <br />River from I-5 to Beltline and prepare a preliminary design for repair. <br />Project Status: Not Started New in FY08-13 CIP. <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs (~ in thousands) <br />Fund 2008 2009 2010 2011 2012 2013 Total <br />Stormwater 0 175 150 0 0 0 $325 <br />total $0 $175 $150 $0 $0 $0 $325 <br />Neighborhood: Multiple Neighborhoods <br />Ward: Multiple Wards <br />City of Eugene 2008-2013 Capital Improvement Program <br />179 <br />Willamette river bank stabilization <br />
The URL can be used to link to this page
Your browser does not support the video tag.