Stormwater Funding Secured <br />Stormwater Rehabilitation and improvements <br />Willamette River Bank Stabilization Study <br />Project Description: Study to determine the extent and severity of bank failures along the Willamette <br />River from I-5 to Beltline and prepare a preliminary design for repair. <br />Project Status: Not Started New in FY08-13 CIP. <br />Specific Plans/Polices Related to this Project <br />Comprehensive Stormwater Management Plan (CSWMP) <br />Stormwater Basin Master Plan <br />Capital Costs (~ in thousands) <br />Fund 2008 2009 2010 2011 2012 2013 Total <br />Stormwater 0 175 150 0 0 0 $325 <br />total $0 $175 $150 $0 $0 $0 $325 <br />Neighborhood: Multiple Neighborhoods <br />Ward: Multiple Wards <br />City of Eugene 2008-2013 Capital Improvement Program <br />179 <br />Willamette river bank stabilization <br />