WASHINGTON COUNTY <br />Name: WASHINGTON SQ RC TRAIL: HALL TO GREENBURG Key: 13527 <br />Hwy/St: WASH. SQ. RC TR. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROW <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: <br />CONSTRUCT MU LTI-USE TRAIL <br />$0 <br />$75,000 2008 OTHER $75,000 <br />$199,000 2008 OTHER $199,000 <br />$0 <br />$158,000 2011 STP-U $136,102 OTHER $6,320 <br />$0 <br />432 000 Applicant: CITY OF TIGARD <br />Status: Const. scheduled to begin in 2011 <br />Work type: Bic~le/Pedestrian <br />Name: FANNO CREEK TRAIL: HALL BOULEVARD CROSSING Key: 15588 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: L and Purchase: <br />METROW Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 401 000 Applicant: THPRD Status: Planning 2010 <br />PROJECT DEVELOPMENT WORK PRIOR TO CONSTRUCTION PHASE Work type: Bicycle/Pedestrian <br />Name: WESTSIDE TRAIL MASTER PLN: WILLAMETTE TO TUALATIN Key: 15586 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 335 000 Applicant: METRO Status: Planning 2010 <br />REQUIRED PLANNING PRIOR TO ENGINEERING AND CONSTRUCTION PHASES Work type: Bic~le/Pedestrian <br />Name: OR 8: N 10TH AVE-N 19TH AVE (CORNELIUS) <br />Key: 11444 <br />Hwy/St: TUALATIN VALLEY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />16.00 to 16.67 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MP O Other: <br />$0 <br />$600,000 2004 <br />$145,000 2006 <br />$0 <br />$2,194,000 2008 OTHER $416,860 CMAQ $1,594,628 <br />$0 <br />Description: Total: $2.939.000 Applicant: CITY OF CORNELIUS Status: Const. scheduled to begin in 2008 <br />RECONSTRUCT MAIN STREET COUPLET. ADD CURBS, SIDEWALK, AND Work type: Congestion Mamt <br />SIGNALS. <br />Name: BANKS-VERNONIA TRAIL: SOUTH TRAILHEAD-BANKS RD Key: 14270 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />83.00 to 83.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$270,000 2008 ENHANC $242,271 <br />$15,000 2008 ENHANC $13,460 <br />$0 <br />$534,000 2008 ENHANC $479,158 <br />$0 <br />Description: Total: 819 000 Applicant: WASHINGTON CO & OPRD Status: Const. scheduled to begin in 2008 <br />CONSTRUCT SHARED-USE PATH, TRAILHEAD PARKING AND LANDSCAPING Work type: Enhancement <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 75 <br />