WASHINGTON COUNTY
<br />Name: OR 219 @ EAST LAUREL ROAD
<br />Hwy/St: HILLSBORO-SILVERTON Key: 13721
<br />• OR 219 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />7.40 to 8.00 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$242,000 2007
<br />$175,000 2008 HSIP $161,385
<br />$0
<br />$1,983,000 2009 HSIP $1,828,723
<br />$0
<br />Description: Total: 2 400 000 Applicant: ODOT
<br />CHANNELIZE OR 219 FOR LEFT & RIGHT TURNS TO EAST LAUREL ROAD
<br />Status: Const. scheduled to begin in 2009
<br />Work type: Safe
<br />Name: US26: DENNIS L EDWARDS TUNNEL (SUNSET HWY)
<br />Key: 11948
<br />Hwy/St: SUNSET
<br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />40.90 to 41.30 Design:
<br />AC.I./AREA: Land Purchase:
<br /> Utility Reloc:
<br />NWACT
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$489,000 2006
<br />$113,000 2008 HBRR $101,395
<br />$0
<br />$8,704,000 2008 HBRR $7,810,099
<br />$0
<br />Description: Total: 9 306 000 Applicant: ODOT Status: Const. scheduled to begin in 2008
<br />REPLACE EXISTING TUNNEL LINING AND LIGHTING ON STRUCTURE # 02552. Work type: Brid e
<br />Name: US26: WEST FORK DAIRY CREEK BRIDGE #02673
<br />Ivey: 14838
<br />Hwy/St: SUNSET
<br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />46.20 to 46.40 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br />NWACT
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$381,000 2008 EARMK $341,871
<br />$119,000 2008 EARMK $106,779
<br />$0
<br />$2,925,000 2008 EARMK $2,624,603
<br />$0
<br />Description: Total: $3.425.000 Applicant: ODOT Status: Const. scheduled to begin in 2008
<br />REPLACE BRIDGE #02673 Work type: Brid e
<br />Name: US26: SUNSET HWY @ GLENCOE ROAD
<br />Key: 12885
<br />Hwy/St: SUNSET
<br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />57.16 to 57.39 Design:
<br />ACT/AREA: Land Purchase:
<br />NWACT Utility Reloc:
<br /> Construction:
<br />MPO:
<br />Non-MPO Other:
<br />$0
<br />$3,227,000 2009 NHS $1,360,926 OTHER $1,193,990 NHS $463,294
<br />$1,500,000 2010 NHS $1,345,950
<br />$0
<br />$0
<br />$0
<br />Description: Total: $4,727,000 Applicant: ODOT Status: Land Purchase 2010
<br />PE FOR REBUILD OF O'XING ADVANCED TO'OS $522K & $1.2 MIL Work type: Modernization
<br />WASHINGTON COUNTY FUNDS Footnote: PE PHASE ORIGINALLY 2007, ADVANCED TO 2005
<br />Name: US26: NW 185TH AVE - CORNELL ROAD
<br />Key: 14070
<br />Hwy/St: SUNSET
<br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share:
<br />Route. -
<br />Planning:
<br />Milepoints:
<br />64.30 to 65.91 Design:
<br />ACT/AREA: Land Purchase:
<br /> Utility Reloc:
<br /> Construction:
<br />MPO:
<br />PORTLAND MPO Other:
<br />$1,106,000 2008 EARMK $198,483 EARMK $793,931
<br />$200,000 2009 STP $179,460
<br />$0
<br />$0
<br />$17,206,000 2010 STP $12,747,043 OTHER $3,000,000
<br />$0
<br />~ Description: Total: $18,512.000 Applicant: ODOT Status: Const. scheduled to begin in 2010
<br />~, WIDEN US26 FROM OR217INTERCH TO CORNELIUS PA SS EXIT Woik type: Modernization
<br />~.
<br />~ 2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 73