WASHINGTON COUNTY <br />Name: OR 219 @ EAST LAUREL ROAD <br />Hwy/St: HILLSBORO-SILVERTON Key: 13721 <br />• OR 219 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />7.40 to 8.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$242,000 2007 <br />$175,000 2008 HSIP $161,385 <br />$0 <br />$1,983,000 2009 HSIP $1,828,723 <br />$0 <br />Description: Total: 2 400 000 Applicant: ODOT <br />CHANNELIZE OR 219 FOR LEFT & RIGHT TURNS TO EAST LAUREL ROAD <br />Status: Const. scheduled to begin in 2009 <br />Work type: Safe <br />Name: US26: DENNIS L EDWARDS TUNNEL (SUNSET HWY) <br />Key: 11948 <br />Hwy/St: SUNSET <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />40.90 to 41.30 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$489,000 2006 <br />$113,000 2008 HBRR $101,395 <br />$0 <br />$8,704,000 2008 HBRR $7,810,099 <br />$0 <br />Description: Total: 9 306 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE EXISTING TUNNEL LINING AND LIGHTING ON STRUCTURE # 02552. Work type: Brid e <br />Name: US26: WEST FORK DAIRY CREEK BRIDGE #02673 <br />Ivey: 14838 <br />Hwy/St: SUNSET <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />46.20 to 46.40 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$381,000 2008 EARMK $341,871 <br />$119,000 2008 EARMK $106,779 <br />$0 <br />$2,925,000 2008 EARMK $2,624,603 <br />$0 <br />Description: Total: $3.425.000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE BRIDGE #02673 Work type: Brid e <br />Name: US26: SUNSET HWY @ GLENCOE ROAD <br />Key: 12885 <br />Hwy/St: SUNSET <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />57.16 to 57.39 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$3,227,000 2009 NHS $1,360,926 OTHER $1,193,990 NHS $463,294 <br />$1,500,000 2010 NHS $1,345,950 <br />$0 <br />$0 <br />$0 <br />Description: Total: $4,727,000 Applicant: ODOT Status: Land Purchase 2010 <br />PE FOR REBUILD OF O'XING ADVANCED TO'OS $522K & $1.2 MIL Work type: Modernization <br />WASHINGTON COUNTY FUNDS Footnote: PE PHASE ORIGINALLY 2007, ADVANCED TO 2005 <br />Name: US26: NW 185TH AVE - CORNELL ROAD <br />Key: 14070 <br />Hwy/St: SUNSET <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />64.30 to 65.91 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$1,106,000 2008 EARMK $198,483 EARMK $793,931 <br />$200,000 2009 STP $179,460 <br />$0 <br />$0 <br />$17,206,000 2010 STP $12,747,043 OTHER $3,000,000 <br />$0 <br />~ Description: Total: $18,512.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />~, WIDEN US26 FROM OR217INTERCH TO CORNELIUS PA SS EXIT Woik type: Modernization <br />~. <br />~ 2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 73 <br />__ <br />