New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINAL 2008-2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br />I~:EY TO PROJECT LISTING <br /> <br /> Shows the name <br /> and location of <br />each project <br /> <br />Shows estimated amount of <br />funds, the federal share (as <br />applicable), the year the <br />funds are committed, and the <br />type of funds committed to <br />the project <br />2~at~e ~3:~ =L~3~~?i~R~GE~~?EE~:c-ETH~~E~t..{a <br />T~~'~t ~~Z ~",FT~-=uv'I~ <br />C~C~r:?S9KC10C: <br />~: <br />,i az ~d°v3 L3ChE=: <br />I'?es~~,~r~: TC.?AI': '~I4.IG~ u~v ~+g3tc~ur ~+~T 5tets2~: ~renst.:su. ~3~e3~e~~~~.~i~~Cll <br />Describes the work being done on the project Identifies who is Shows the Shows the <br />sponsoring the <br />project or who primary type year project <br />Identifies which MPO boundary the project falls requested the pro- of work is set to go <br />within (or Non-MPO for those outside). ject to contract <br />There are six primary sections in the STIP, one for each of the five ODOT regions and one for Statewide programs. The five <br />regional sections are further sorted by County. <br />Projects are then sorted by Route and then by Work Type. <br />The following information appears for each project in this document: <br />• The first element listed is the Project Name with the Highway Name directly below. <br />• Under the Highway name is the Route, a more common name for a specific section of roadway. <br />• Below the route are the beginning and ending Milepoints. These identify where the project starts and ends. <br />• Below the milepoints is the ACT (Area Commission on Transportation). <br />• Below the ACT is the MPO. This indicates, when applicable, which Metropolitan Planning Organization boundary the <br />project falls within. If the project is outside an MPO boundary, "Non-MPO" is listed. <br />• Below the MPO is a Description of the main project work taking place. <br />• Below the description is the Key number, a unique numeric identifier that stays with the project for its entire life. <br />• Up and to the right is the Funding Information Section. The first four lines are Design, Land Purchase, Utility Reloca- <br />tion and Construction. These are the phases of a construction project. Next is Planning activities relating to studies, re- <br />finement plans, location EIS, MPO planning, State Planning & Research projects. Other is for activities such as Transit <br />(planning, operations, and purchase) and other non-construction projects. The Total Cost and Year columns identify <br />how much total funding is programmed for each phase and the year it was started (if prior to the 2008-2011 STIP period) <br />or the year it is planned to begin. Each column to the right of these phases identifies the type of funding programmed and <br />the amount of that fund. Required matching funds are not included in the columns located to the right of the Total Cost <br />column. <br />• Directly below the funding information is the Applicant. This identifies who the project owner is. <br />• To the right of the applicant field is the Status of the project. This indicates what is happening with the project and in <br />what year. <br />• Below the status line is the Work Type. This identifies the primary type of work associated with each project. The STIP <br />work type order is Modernization first, then Safety, Pavement Preservation, Bridge, and Operations, followed by all other <br />work types. <br />Tc~La[ ~~ t: x,ear_ 1st ~~~: <br />Identifies funds <br />committed from <br />the previous <br />STIP <br />2a~ Viand: share: tr+~ Fwd= 56 e~ Frt~elr. ~6:u~: <br />Unique ~ <br />identifier <br />for each <br />project <br />•) <br />&~7 <br />~',Q~fl :vG~3 3~If.F~ X63#;3~'s <br />~~ <br />~i7 <br />~tttkl,Ce~r? ?~~ii' OFF '~l:.lt~;~#4 <br />~» <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.