MULTNOMAH COUNTY <br />Name: DIVISION ST RECONSTRUCTION PROJECT: SE 6TH-SE 39TH Key: 14566 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $338.000 Applicant: CITY OF PORTLAND Status: Planning 2008 <br />PLANNING TO ADDRESS MULTI-MODAL NEEDS FROM SE 10TH TO SE 60TH Work type: Planning <br />AVENUES <br />Name: POWELL/FOSTER CORRIDOR PLAN <br />Hwy/St: VARIOUS HIGHWAYS Key: 14565 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 223 000 Applicant: METRO Status: Planning 2008 <br />PROCESS TO PROVIDE FEASIBLE TRANSPORTATION IMPROVEMENTS FOR Work type: Planning <br />THE CORRIDOR <br />Name: NE 238TH DRIVE @ TREEHILL DRIVE <br />Key: 13156 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$42,000 2008 HSIP $38,732 <br />$70,000 2008 HSIP $64,554 <br />$0 <br />$228,000 2009 HSIP $210,262 <br />$0 <br />Description: Total: 340 000 Applicant: MULTNOMAH COUNTY Status: Const. scheduled to begin in 2009 <br />WIDEN ROADWAY INSIDE CURVE, INSTALL SIDEWALK TO IMPROVE SIGHT Work type: Safetv <br />DISTANCE <br />Name: SANDY BLVD SAFETY IMPROVEMENTS <br />Key: 12150 <br />Hwy/St: SANDY BOULEVARD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />1.88 to 3.08 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 748 000 Applicant: CITY OF PORTLAND Status: Const. scheduled to begin in 2008 <br />UPGRADE SIGNALS TO CURRENT STANDARDS. RESTRICT ACCESS. IMPROVE Work type: Safe <br />SIGNING. <br />Name: GUY TALBOT STATE PARK - LATOURELL FALLS <br />Hwy/St: HISTORIC COLUMBIA RIVER Key: 14092 <br />R Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. -- <br />Planning: <br />Milepoints: <br />12.00 to 12.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 196 000 Applicant: OPRD Status: Const. scheduled to begin in 2009 <br />ENHANCEMENT PROJECT Work type: Special Programs <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 65 <br />