MULTNOMAH COUNTY <br />Name: 223RD UNDERCROSSING: SANDY BLVD -BRIDGE ST <br />Key: 11429 <br />Hwy/St: NE 223RD AVE <br />R Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$1,155,000 2001 <br />$465,000 2005 <br />$0 <br />$7,255,000 2008 TSP $1,523,550 STP-U $1,757,676 OTHER $3,772,600 <br />$0 <br />Description: Total: $8,875,000 Applicant: MULTNOMAH COUNTY Status: Const. scheduled to begin in 2008 <br />RECONSTRUCT RR O-XING AND APPROACHES AT NE 223RD AVE. Work type: Modernization <br />Footnote: CN FED ALLOC TSP: $1,535,005/STP-U $1,775,080/$1M FED STP-U PROG 2 <br />Name: SELLWOOD BRIDGE Key: 13762 <br />Hwyist: vAR <br />R Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$12,229,000 2008 HBRR $5,376,810 STP-U $1,975,155 HBRRL $3,621,117 <br />$13,801,000 2009 HBRR $5,448,800 EARMK $1,981,382 EARMK $2,972,073 EARMK $1,981,382 <br />$0 <br />$0 <br />$0 <br />Description: Total: $26,030,000 Applicant: MULTNOMAH COUNTY Status: Land Purchase 2009 <br />BRIDGE REPLACEMENT (STRUCTURE #6879) Work type: Modernization <br />Footnote: ESTIMATED CONSTRUCTION $100 MILLION, YEAR 2011 <br />Name: MLK O-XING/TURN LANES: COLUMBIA TO LOMBARD Key: 13502 <br />Hwy/St: <br />R Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />outs. <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 2 229 000 Applicant: CITY OF PORTLAND Status: Final Plan sched. to begin in 2008 <br />PLANNING & ENGINEERING WORK TO IMPROVE TRUCK MOVEMENTS AT OR Work type: Modernization <br />NEAR MLK <br />Name: SE 190TH DR: PLEASANT VIEW/HIGHLAND TO SW 30TH ST Key: 15601 <br />Hwy/St: SE 190TH DRIVE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $670,000 Applicant: CITY OF GRESHAM Status: Const. scheduled to begin in 2011 <br />TURN LANE AND BIKE LANES Work type: Modernization <br />Name: NE 47TH INTERSECTION ROADWAY IMPROVEMENT Key: 13987 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $4,100,000 Applicant: PORT OF PORTLAND Status: Const. scheduled to begin in 2008 <br />WIDEN & CHANNELIZE AT CORNFOOT & COLUMBIA OTIA 3 (FREIGHT/IND Work type: Modernization <br />ACCESS/JOB CREATION) <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 61 <br />