New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />MULTNOMAH COUNTY <br />Name: N LOMBARD (COLUMBIA SLOUGH O-XING) Key: 14408 ) <br />Hwy/St: N LOMBARD ST. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />i <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$997,000 2008 STP-U $894,608 <br />$0 <br />$0 <br />$3,930,000 2009 STP-U $1,022,653 OTHER $2,790,300 <br />$0 <br />Description: Total: $4.927,000 Applicant: CITY OF PORTLAND Status: Const. scheduled to begin in 2009 <br />BRIDGE RECONSTRUCTION Work type: Bridge <br />Name: N VANCOUVER AVE: COLUMBIA SLOUGH BRIDGE(PORTLAND) Key: 14979 <br />Hwy/St: N VANCOUVER AVE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.46 to 0.53 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$1,256,000 2010 HBRR $1,127,009 <br />$140,000 2010 HBRR $125,622 <br />$0 <br />$9,028,000 2011 HBRR $8,100,824 <br />$0 <br />Description: Total: $10,424,000 Applicant: CITY OF PORTLAND <br />REPLACE EXISTING BRIDGE #001696 <br />status: t_;onst. scneauiea to negm m ~~ i i <br />Work type: Bridge <br />Name: MORRISON BRIDGE REHABILITATION Key: 14980 <br />Hwy/St: SE MORRISON ST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.05 to 0.37 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />2010 ~ HBRR ~ $1,130,598 <br />2011 ~ HBRR ~ $4,522,392 <br />Description: Total: $6,300.000 Applicant: MULTNOMAH COUNTY Status: Const. scheduled to begin in 2011 <br />BRIDGE #08589 REHABILITATION Woik type: Bridee <br />Name: N KILLINGSWORTH ST: N COMMERCIAL - NE MLK JR BLVD Key: 14405 <br />Hwy/St: BURNSIDE ST. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $653.000 Applicant: CITY OF PORTLAND Status: Final Plan sched. to begin in 2009 <br />STREETSCAPE AND PEDESTRIAN SAFETY IMPROVEMENTS Work type: Congestion Mgmt <br />Name: EASTSIDE STREETCAR:NW 10TH AVE(LOVEJOY ST TO OMSI) Key: 14381 <br />Hwy/St: NW 10TH AVE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />~ $52,000,000 ~ 2009 ~ CMAQ ~ $933,192 ~ OTHER ~ $50,960,000 ~ ~ ~ ~ ~ <br />Description: Total: $53.839,000 Applicant: CITY OF PORTLAND Status: Const. scheduled to begin in 2009 <br />EXTEND STREETCAR LINE 3.4 MILES TO EASTSIDE Work type: Congestion Mgmt <br />Footnote: CONSTRUCTION STP-U FED ALLOCATION: $1,000,000 <br />ZOOS-ZO11 FINAL STIP www,oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.