New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MULTNOMAH COUNTY <br />Name: I-84:EAST PORTLAND FWY -NE 181ST AVENUE Key: 13703 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-84 <br /> Planning: <br />Mtlepomts. <br /> <br />5.50 to 12.73 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: <br />50 MM OPEN GRADED OVERLAY <br />$0 <br />$339,000 2008 IM $171,944 IM $140,682 <br />$20,000 2009 IM $18,444 <br />$0 <br />$8,377,000 2009 IM $7,725,269 <br />$0 <br />$8.736.000 Applicant: ODOT <br />status: t;onst. scneautea to oegm m ~uvy <br />Work type: Pavement Preservation <br />Name: I-84: NE 181ST AVE INTERCHGE SECTION Key: 15141 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-84 <br /> Planning: <br />Milepoints: <br />12.73 to 13.83 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />IM ~ $2,084,172 <br />Description: Total: $2,260,000 Applicant: ODOT <br />INTERSTATE MAINTENANCE PROGRAM PROJECT <br />Status: Const. scheduled to begin in "lU l U <br />Work type: Pavement Preservation <br />Name: I-205: COLUMBIA RIVER (GLENN JACKSON) BR #09555 Key: 14833 <br />Hwy/St: EAST PORTLAND <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-205 <br /> Planning: <br />Milepoints: <br />25.61 to 27.18 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$104,000 2008 OTHER $52,000 HBRR $46,660 <br />$0 <br />$0 <br />$2,669,000 2008 HBRR $1,197,447 OTHER $1,334,500 <br />$0 <br />Description: Total: $2,773,000 Applicant: ODOT <br />REPAIR/REPLACE BAD DECK JOINTS. ODOT IS LEAD IN JOINT PROJ W/ <br />WSDOT. COST IS ODOT SHARE. <br />Status: Const. scheduled to begin mlUUS <br />Work type: Bridge <br />Name: I-405: FREMONT BRIDGE - MARQUAM BRIDGE Key: 13704 <br />Hwy/St: STADIUM FREEWAY <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-405 <br /> Planning: <br />Milepoints: <br />0.04 to 4.21 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: <br />INLAY W/DENSE GRADED MIX <br />$0 <br />$250,000 2005 <br />$0 <br />$0 <br />$10,000,000 2009 IM $9,222,000 <br />$0 <br />$10,250,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2009 <br />Work type: Pavement Preservation <br />Name: OR99E: MLK VIADUCT - SE HAROLD ST Key: 15045 <br />Hwy/St: PACIFIC HWY EAST <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99E <br /> Planning: <br />Milepoints: <br />1.20 to 3.10 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$262,000 2008 NHS $223,338 HSIP $12,081 <br />$0 <br />$0 <br />$1,689,000 2010 NHS $1,394,297 HSIP $77,880 BIKPED $50,670 <br />$0 <br />Description: Total: $1,951.000 Applicant: ODOT Status: Const. scheduled to begin m ZU1U <br />2" OVERLAY Work type: Pavement Preservation <br />Footnote: Project has Safety & Bikped element <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.