MULTNOMAH COUNTY <br />Name: I-5: PACIFIC HWY SB OVER UPRR (BRIDGE #58588E) Key: 14800 <br />Hwy/St: PACIFIC <br />I Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -5 <br />Planning: <br />Milepoints: <br />301.60 to 301.81 Design: <br />ACT/AREA: L and Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $6,295,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REHAB WITH DECK OVERLAY & JOINT REPAIR Work type: Bridee <br />Name: I-5: SW IOWA STREET VIADUCT BR #08197 <br />Key: 14949 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />298.09 to 298.39 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$3,116,000 2008 EARMK $2,795,987 <br />$0 <br />$0 <br />$42,640,000 2009 EARMK $35,965,220 EARMK $2,295,652 <br />$0 <br />Description: Total: $45.756,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />DECK REHAB Work type: Bridee <br />Name: I-S:VICTORY BLVD TO LOMBARD PH 2 <br />Key: 15190 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />305.46 to 306.73 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: $7.000.000 Applicant: ODOT Status: Final Plan sched. to begin in 2008 <br />REPLACE DENVER VIADUCT; RECONSTRUCT LOCAL ROAD CONNECTS; NEW Work type: Modernization <br />SIGNAL <br />Name: I5: VICTORY BLVD TO LOMBARD SECTION <br />Key: 12076 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints. <br />305.46 to 306.73 Design: <br />ACT/AREA: L and Purchase: <br />METROC Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 __ <br />$10,541,000 2001 <br />$2,239,000 2006 <br />$100,000 2008 STATE $100,000 <br />$60,300,000 2008 OTIAIII $28,944,000 STP $14,608,941 EARMK $11,362,510 EARMK $2,164,288 <br />$0 <br />Description: Total: $73,180,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />WIDEN HIGHWAY TO 3 LANES, REALIGN RAMPS Work type: Modernization <br />Name: I-5: BRYANT ST - SARATOGA STREET <br />Key: 15210 <br />Hwy/St: PACIFIC <br />• I 5 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />305.15 to 305.15 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />STATE ~ $50,000 <br />Description: Total: 50 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />CONSTRUCT SAFETY IMPROVEMENTS FOR PEDESTRIAN OVERPASS Work type: Modernization <br />2008-2011 FINAL STIP Www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 51 <br />