CLACKAMAS COUNTY <br />Name: OR224: JCT HWY 172 - JCT HWY 161 <br />Key: 15365 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I,/AREA: Land Purchase: <br />METROE Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$436,000 2007 <br />$55,000 2008 ENHANC $49,352 <br />$0 <br />$4,515,000 2009 STP $2,187,707 HBRR $202,565 HSIP $374,736 ENHANC $1,296,419 !, <br />$0 <br />Description: Total: $5,006,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />OVERLAY W/SIDEWALKS, LANDSCAPING & PED REFUGE MEDIAN Work type: Pavement Preservation <br />Footnote• PROJECT HAS BRIDGE funds of $234,00, Enhanc & Safety elements <br />Name: MULTI-USE MASTER PLANS:MT SCOTT-SCOUTER'S LOOP Key: 14398 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />Description: Total: 112 000 Applicant: METRO Status: Planning 2009 <br />REQUIRED PLANNING PRIOR TO ENGR & CONST PHASES Work type: Plannine <br />Name: STAFFORD RD @ MOUNTAIN RD Key: 13161 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.01 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$189,000 2006 <br />$275,000 2008 HSIP $253,605 <br />$0 <br />$659,000 2008 OTHER $65,900 HSIP $546,957 <br />$0 <br />Description: Total: $1,123,000 Applicant: CLACKAMAS COUNTY Status: Const. scheduled to begin in 2008 <br />REALIGN & WIDEN STAFFORD RD -WIDEN MOUNTAIN RD FOR SEPARATE Work type: Safe <br />LEFT & RIGHT TURN LANES <br />Name: SE LAKE RD: SE 21ST AVE TO SE KUEHN RD Key: 14064 <br />Hwy/St: EAST PORTLAND <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />METROC <br /> Construction: <br />MPO: <br />PORTLAND MPO Other: <br />$0 <br />$580,000 2007 <br />$580,000 2008 EARMK $281,034 EARMK $239,400 <br />$0 <br />$3,298,000 2008 EARMK $2,959,295 <br />$0 <br />Description: Total: $4,458,000 Applicant: MILWAUKIE <br />SAFETY BICYCLE SIDEWALK FACILITIES IMPROVEMENT ON LAKE ROAD <br />status: const. scnearnea to negm m zuuu <br />Work type: Safe <br />Name: HISTORIC SAHALIE FALLS BRIDGE Key: 14108 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />BRIDGE PRESERVATION <br />$0 <br />$0 <br />$0 <br />$0 <br />$231,000 2008 FLHP $231,000 <br />$0 <br />231000 Applicant: WFLHD <br />Status: Const. scheduled to begin in 2008 <br />Work type: Snecial Pro rg ams <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 38 <br />., <br />~. . <br />l <br />~_ ~ <br />