New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FINAL 2008-2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM <br />CONDITIONS of APPROVAL <br />REGION 4 PROJECTS: <br />Project Name: US97 Bend North Corridor Project: Phase 1 (aka US97 @ Cooley Road <br />Interchange) (key #14020) <br />Conditions of Approval: <br />Before funds are spent on right-of--way acquisition, utility relocation, or construction of a grade separated inter- <br />change at US97 and Cooley Road in Bend, ODOT, the City of Bend, Deschutes County, and the Metropolitan <br />Plaiuiing Organization shall complete and submit to the Oregon Transportation Commission (OTC) for approval a <br />refinement plan for extending the Bend Parkway from its northern terniinus to Bend's north urban growth bound- <br />ary, including the interconnection of Highway 97 and Highway 20, and how the proposed interchange is part of <br />the plan. The refinement plan shall include land use actions and transportation facility design and financing <br />needed to implement the plan. <br />Page 352 <br />
The URL can be used to link to this page
Your browser does not support the video tag.