New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATEWIDE <br />Name: 2011 PE & RW BUCKET INTERSTATE MAINTENANCE PROGRAM Key: 15136 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $5,000,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />PE & RW POOL FOR FUTURE PROJECTS Work type: Pavement Preservation <br />Name: 2010 INTERSTATE SIGN REPLACEMENT PROJECT Key: 15133 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Mllepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $2,140,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REPLACE SIGNS ON INTERSTATE HIGHWAYS Work type: Pavement Preservation <br />Name: 2011 INTERSTATE SIGN REPLACEMENT PROJECT Key: 15134 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $2.140.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />REPLACE SIGNS ON INTERSTATE HIGHWAYS Work type: Pavement Preservation <br />Name: 2006 IM PE & ROW BUCKET Key: 13130 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 102 000 Applicant: ODOT Status: Pooled Funding 2008 <br />IM PE & ROW BUCKET Work type: Pavement Preservation <br />Name: FLHP PE & CE BUCKET 2009 Key: 14514 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />STATEWIDE <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$3,700,000 2009 FLHP $3,700,000 <br />$0 <br />$0 <br />$2,000,000 2009 FLHP $2,000,000 <br />$2,200,000 2009 FLHP $2,200,000 <br />Description: Total: $7.900,000 Applicant: FLHP Status: Pooled Funding 2009 <br />FUTURE FOREST HIGHWAY PE & CE RESERVE Work type: Pavement Preservation <br />2~~8-211 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 295. <br />
The URL can be used to link to this page
Your browser does not support the video tag.