New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UNION COUNTY <br />Name: GRANDE RONDE RV UPRR UXING/UPPER PERRY ARCH BRIDGE Key: 11852 <br />Hwy/St: OLD OREGON TRAIL <br />• I 84 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />256.31 to 256.41 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$286,000 2002 <br />$231,000 2007 <br />$0 <br />$2,005,000 2008 ENHANC $395,799 STATE $380,950 STATE $1,182,950 ', <br />$0 <br />Description: Total: $2.522.000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REHAB BRIDGE #00626 ON FRONTAGE ROAD Work type: Bridee <br />Footnote: Project has Enhancement element <br />Name: OR82: IMBLER STORMWATER AND PED IMPROVEMENTS Key: 14672 <br />Hwy/St: WALLOWA LAKE <br />• OR 82 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />11.97 to 12.41 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$200,000 2008 STP $179,460 <br />$375,000 2009 STP $336,488 <br />$230,000 2009 STP $206,379 <br />$1,215,000 2010 STP $686,838 BIKPED $425,250 OTHER $24,300 <br />$0 <br />Description: Total: $2.020.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />CONSTRUCT DRAINAGE SYSTEM, SIDEWALKS, GUTTERS, CURBS Woik type: Modernization <br />Footnote: Project has Bikped element <br />Name: US30: GRANDE RONDE R &UPRR (ORO DELL) BR #08431 Key: 14831 <br />Hwy/St: LA GRANDE-BAKER <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />0.09 to 0.63 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$243,000 2009 HBRR $218,044 <br />$95,000 2010 HBRR $85,244 <br />$0 <br />$2,288,000 2011 HBRR $2,053,022 <br />$0 <br />Description: Total: $2.626.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />DECK OVERLAY; JOINT REPAIR; RAIL RETROFIT; BOX GIRDER & CONCRETE Work type: Bridee <br />CAP REPAIR <br />Name: OR82/OR244: GRANDE RONDE - WALLOWA R -BUNDLE 408 Key: 14228 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $15,711,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REPLACE BRIDGES 00800A, 05192, REPAIR BRIDGE -01038A Work type: Brid e <br />Name: CATHERINE CREEK (MILLER LANE) BRIDGE Ivey: 15146 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 827 000 Applicant: UNION COUNTY Status: Const. scheduled to begin in 2008 <br />REPLACE EXISTING STRUCTURE Work type: B <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.