New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MORROW COUNTY <br />Name: OR74: WILLOW CREEK (COURTHOUSE) BRIDGE #00778A Key: 14697 <br />Hwy/St: HEPPNER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• OR-74 <br />ou <br />Planning: <br />Milepoints: <br />45.95 to 46.02 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$42,000 2008 STP-LR $37,687 <br />$38,000 2008 STP-LR $34,097 <br />$44,000 2008 STP-LR $39,481 <br />$0 <br />$0 <br />Description: Total: 124 000 Applicant: ODOT Status: Utility Relocation 2008 <br />PLACE RIPRAP ALONG BTS 2 & 3; REPLACE JOINT SEALS Work type: Bridee <br />Footnote: TO BE CONSTR UNDER KEY 15403 <br />Name: OR74:WILLOW CR BR -MORROW CO FAIRGROUND (HEPPNER) Key: 15403 <br />Hwy/St: HEPPNER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• OR-74 <br />ou . <br />Planning: <br />Milepoints: <br />45.95 to 46.02 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$0 <br />$0 <br />$0 <br />$1,998,000 2009 STP $1,416,316 OTHER $19,980 HBRR $89,640 BIKPED $299,700 <br />$0 <br />Description: Total: $1,998,000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />ROADWAY AND PEDESTRIAN IMPROVEMENTS, BRIDGE REHAB Work type: Pavement Preservation <br />Name: OR207: CORRIDOR INTERSECTION IMPROVEMENTS Key: 14671 <br />Hwy/St: LEXINGTON-ECHO <br />R te• OR-207 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />9.89 to 82.36 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 ---~ <br />$100,000 2008 STP $89,730 <br />$125,000 2009 STP $56,081 OTHER $62,500 <br />$0 <br />$877,000 2009 STP $747,585 OTHER $43,850 <br />$0 <br />Description: Total: 1 102 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />IMPROVE SIX IDENTIFIED INTERSECTIONS Work type: Modernization <br />Name: OR207/74: COURT STREET (HEPPNER) IMPROVEMENTS Key: 14677 <br />Hwy/St: HEPPNER <br />R te• OR-207 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />46.00 to 46.50 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$181,000 2008 STATE $181,000 <br />$263,000 2008 STP $96,756 HSIP $143,098 <br />$180,000 2008 STP $161,514 <br />$0 <br />$0 <br />Description: Total: $624,000 Applicant: ODOT Status: Utility Relocation 2008 <br />RECONSTRUCT ROADWAY, INSTALL RETAINING WALL, PEDESTRIAN Work type: Pavement Preservation <br />IMPROVEMENTS Footnote: TO BE CONSTR UNDER KEY 15403- Proj. has Safety element <br />Name: CLARKS CANYON-PADBERG(CLARKS CANYON RD) BRIDGE Key: 15145 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$85,000 2006 <br />$15,000 2007 <br />$0 <br />$436,000 2008 OTIA I $436,000 <br />$0 <br />Description: Total: 536 000 Applicant: MORROW COUNTY Status: Const. scheduled to begin in 2008 <br />REPLACE EXISTING STRUCTURE Woik type: Bridee <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 262 <br />
The URL can be used to link to this page
Your browser does not support the video tag.