New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BAKER COUNTY <br />Name: OR 86: BAKER-COPPERFIELD HWY GUARDRAIL (PHASE 1) Key: 14688 <br />Hwy/St: BAKER-COPPERFIELD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-86 <br /> Planning: <br />Milepoints: <br />40.00 to 47.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2009 HSIP $36,888 <br />$10,000 2010 HSIP $9,222 <br />$0 <br />$450,000 2011 HSIP $414,990 <br />$0 <br />Description: Total: 500 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />I OF 6 PHASES TO REPLACE DEFICIENT GUARDRAIL Work type: Safe <br />Name: US30: BURNT RIVER & UPRR BRIDGE #00700 Key: 14695 <br />Hwy/St: HUNTINGTON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />2.65 to 2.g5 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$268,000 2008 HBRR $240,476 <br />$23,000 2009 HBRR $20,638 <br />$0 <br />$1,663,000 2010 HBRR $1,492,210 <br />$0 <br />Description: Total: $1,954,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />DECK OVERLAY; RAIL RETROFIT; REPAIR GIRDERS, CAPS, JOINTS; REPAIR Work type: Bridee <br />TRUSS & BEARINGS <br />Name: SUMPTER VALLEY RAILROAD RESTORATION <br />Key: 15366 <br />xwyist: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACZ,/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 500 000 Applicant: SUMPTER VALLEY RR RESTOR. INC Status: Non-Construction Project 2008 <br />TRACK EXTENSION Work type: <br />Name: I-84:BURNT RIVER(DIXIE CR)-LIME INTCHG BUNDLE 203 Key: 14116 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 -- <br />$1,759,000 2006 <br />$140,000 2007 <br />$0 <br />$14,919,000 2008 OTIAIII $12,382,770 OTIAI $1,044,330 HBRR $1,740,286 <br />$0 <br />Description: Total: $16,818,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE BRS #01788, #01789, #01786, #09354, REPAIR BR #01786A Work type: Bridee <br />Name: LEO ADLER MEM PARKWAY: MADISON ST -COURT STREET Key: 14282 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$123,000 2006 <br />$380,000 2008 ENHANC $340,974 <br />$0 <br />$589,000 2009 ENHANC $391,097 OTHER $153,140 <br />$0 <br />Description: Total: $1,092,000 Applicant: BAKER CITY Status: Const. scheduled to begin in 2009 ~: :' <br />CONSTRUCT SHARED-USE PATH (BICYCLE/PEDESTRIAN) Work type: Enhancement ,~ <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 255 <br />1 <br />~- ~ ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.