New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KLAMATH COUNTY <br />Name: OR140: LAKESHORE DRIVE -GREEN SPRINGS HWY <br />Hwy/St: LAKE OF THE WOODS KeY~ 14552 <br />R OR-140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. <br />Planning: <br />Milepoints: <br />16.04 to 68.60 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$675,000 2006 <br />$24,000 2007 <br />$0 <br />$2,865,000 2008 NHS $1,439,628 HSIP $237,789 NHS $899,768 <br />$0 <br />Description: Total: 3 564 000 Applicant: ODOT Status: Advanced from FY 2008 <br />PAVEMENT PRESERVATION, ADD LEFT TURN REFUGE, UPGRADE Work type: Pavement Preservation <br />GUARDRAIL, REPLACE DRAIN PIPES Foofiote: CONST ADVANCE TO 2007 -Prof has Safety element <br />Name: OR140: MODOC BILLY CR -FISH HOLE CR (BEATTYBLY) Key: 12573 <br />Hwy/St: KLAMATH FALLS-LAKEVIEW <br />R OR-140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. <br />Planning: <br />Milepoints: <br />34.30 to 54.11 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,000,000 2005 <br />$50,000 2008 ADVCON $50,000 <br />$0 <br />$3,023,000 2008 STP $217,003 STP $2,495,535 <br />$0 <br />Description: Totai: $4.073.000 Applicant: ODOT <br />OVERLAY PAVEMENT; ADJUST GUARDRAIL ENDS; FIX AREAS WITH <br />SETTLING SUBBASE; THIN TREATMENT <br />Status: Const. scheduled to begin in 2008 <br />Work type: Pavement Preservation <br />Name: OR140:N LITTLE BUTTE CREEK-GREAT MEADOW SNOW PARK Key: 15390 <br />Hwy/St: LAKE OF THE WOODS <br />• OR 140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />16.00 to 33.70 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SCOACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$400,000 2007 <br />$0 <br />$0 <br />$8,500,000 2008 NHS $7,321,968 HSIP $313,548 <br />$0 <br />Description: Total: 8 900 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />OVERLAY, GUARDRAIL Work type: Pavement Preservation <br />Footnote: Project has Safety element <br />Name: OR140: SUMMIT SNOW PARK RD-FOURMILE FLAT RD <br />Hwy/St: KLAMATH FALLS-LAKEVIEW KeY~ 15391 <br />• OR 140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />30.92 to 41.50 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />OVERLAY, GUAR DRAIL <br />$0 <br /> <br />$100,000 <br />2007 _ <br />$87,000 2009 STATE $87,000 <br />$0 <br />$5,778,000 2009 NHS $5,184,599 <br />$0 <br />$5.965,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2009 <br />Work type: Pavement Preservation <br />Name: VOLCANIC LEGACY SCENIC BYWAY: DOAK MTN INTERP SITE Key: 14105 <br />Hwy/St: LAKE OF THE WOODS <br />• OR 140 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />53.00 to 53.10 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~~_ <br />,, '~ <br />J <br />^_ .\ <br />Description: Total: 58 000 Applicant: WESTERN FEDERAL LANDS HWY DN Status: Const. scheduled to begin in 2009 <br />FEDERAL LANDS HIGHWAY PROGRAM PROJECT Work type: Special Programs <br />1 <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 241 ` _ <br />_ _ _._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.