New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JEFFERSON COUNTY <br />Name: US26 @ GUMWOOD LANE (MADRAS) <br />Key: 14936 <br />Hwy/St: WARM SPRINGS <br />• US 26 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />110.60 to 111 .80 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$218,000 2008 HSIP $201,040 <br />$124,000 2009 HSIP $114,353 <br />$36,000 2010 HSIP $33,199 <br />$1,260,000 2010 HSIP $1,161,972 <br />$0 <br />Description: Total: $1,638,000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />ACCESS MANAGEMENT AT BOTH GUMWOOD INTERSECTIONS, REALIGN & Work type: Safe <br />CHANNELIZE COLUMBIA DRIVE <br />Name: US97 @ SW IRIS LANE Key: 13847 <br />Hwy/St: THE DALLES-CALIFORNIA <br />• US 97 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />103.63 W 104 .93 Design: <br />AC.1./AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$300,000 2007 <br />$62,000 2008 HSIP $57,176 <br />$13,000 2009 HSIP $11,989 <br />$1,189,000 2009 HSIP $1,096,496 <br />$0 <br />Description: Total: 1 564 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />CONSTRUCT LEFT TURN LANES ON US97 & IRIS LANE CLOSE JERICHO LANE Work type: Safetv <br />WEST OF US97 <br />Name: US97 @ CHERRY LANE (MADRAS) <br />Key: 14939 <br />Hwy/St: THE DALLES-CALIFORNIA <br />• US 97 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />89.58 to 89.75 Design: <br />AC.T/AREA: Land Purchase: <br /> Utility Reloc: <br />COACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$218,000 2008 HSIP $201,040 <br />$386,000 2009 HSIP $355,969 <br />$37,000 2010 HSIP $34,121 <br />$877,000 2010 HSIP $808,769 <br />$0 <br />Description: Total: $1.518.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />REALIGNMENT & CHANNELIZATION Work type: Safe <br />Name: OR361: A ST -EST SIDEWALK/STREETSCAPE (CULVER) Key: 15478 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />COACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 892 000 Applicant: CITY of CULVER Status: Const. scheduled to begin in 2010 <br />SIDEWALK/STREETSCAPE ENHANCEMENT PROJECT Work type: Enhancement <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 239 <br />
The URL can be used to link to this page
Your browser does not support the video tag.