New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESCHUTESCOUNTY <br />Name: OR126: MP97 - RIMROCK WAY (REDMOND) <br />Hwy/St: MCKENZIE Key: 14190 <br />R te• OR-126 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou <br />Planning: <br />Milepoints: <br />97.00 to 111 .00 Design: <br />AC.1./AREA: Land Purchase: <br /> Utility Reloc: <br />COACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$550,000 2006 <br />$500,000 2007 <br />$80,000 2008 NHS $71,784 <br />$5,667,000 2008 NHS $508,500 HSIP $783,916 NHS $3,813,749 <br />$0 <br />Description: Total: 6 797 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />PRESERVE PAVEMENT, INSTALL FLASHING BEACON AT OR126 & Work type: Pavement Preservation <br />HELMHOLTZ, UPGRADE SIDEWALKS Footnote: Project has Safety element <br />Name: US20 @ TUMALO ENVIRONMENTAL ASSESSMENT <br />Hwy/St: MCKENZIE-BEND Key: 14892 <br />• US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />13.72 to 15.10 Design: <br />ACT/AREA: Land Purchase: <br />SCOACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 408 000 Applicant: ODOT Status: Planning 2008 <br />PLANNING PROJECT Work type: Modernization <br />Name: US20 PURCELL - POWELL BUTTE HWY (BEND) REFINEMENT <br />Hwy/St: CENTRAL OREGON Key: 14893 <br />• US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />2.29 to 4.79 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$292,520 <br />Description: Total: 326 000 Applicant: ODOT Status: Planning 2008 <br />PLANNING PROJECT Work type: Modernization <br />Name: US20: PURCELL - ARNOLD ICE CAVE (BEND) <br />Hwy/St: CENTRAL OREGON Key: 14932 <br />• US 20 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />2.29 to 12.69 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />BEND MPO Other: <br />$0 <br />$217,000 2008 NHS $194,714 <br />$0 <br />$0 <br />$1,183,000 2010 NHS $1,061,506 <br />$0 <br />Description: Total: $1.400.000 Applicant: ODOT Status: Const. scheduled to begin in 2010 <br />PAVEMENT PRESERVATION Work type: Pavement Preservation <br />Name: US97: LAVA BUTTE - HWY OR31 JCT <br />Hwy/St: THE DALLES-CALIFORNIA Key: 13858 <br />R US 97 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />oute. - <br />Planning: <br />Milepoints: <br />149.48 to 169.68 Design: <br />ACT/AREA: Land Purchase: <br />COACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $252.000 Applicant: ODOT Status: Env Doc sched. to begin in 2008 <br />ENVIRONMENTAL ANALYSIS TO WIDEN US97 Work type: Modernization <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.