New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: REGIONWIDE TRAFFIC SIGNAL UPGRADES <br />Key: 14987 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$150,000 2008 STP $134,595 <br />$100,000 2009 STP $89,730 <br />$0 <br />$750,000 2011 STP $672,975 <br />$0 <br />Description: Total: $1.000.000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />UPGRADE TRAFFIC SIGNALS Work type: Operations <br />Name: .REGION 3 OPERATIONS PE/RW IN 2010 Key: 15027 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br /> Planning: <br />Milepoints. <br />0.00 to 0.00 Design: <br />ACT/AREA: 1-and Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 400 000 Applicant: ODOT Status: Pooled Funding 2010 <br />PE & RW FOR OPERATIONS PROJECTS Work type: Operations <br />Name: REGIONWIDE RWIS-TRAFFIC CAMERAS Key: 14983 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$40,000 2009 STP $35,892 <br />$10,000 2010 STP $8,973 <br />$0 <br />$450,000 2011 STP $403,785 <br />$0 <br />Description: Total: 500 000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />UPGRADE EXISTING CAMERAS/ INSTALL NEW CAMERAS Work type: Operations <br />Name: REGION 3 PRESERVATON PE/RW IN 2010 Key: 15024 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 500 000 Applicant: ODOT Status: Pooled Funding 2010 <br />PE & RW FOR PRESERVATION PROJECTS Work type: Pavement Preservation <br />Name: REGION 3 PRESERVATON PE/RW IN 2011 Key: 15025 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: VAR <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 500 000 Applicant: ODOT Status: Pooled Funding 2011 <br />PE & RW FOR PRESERVATION PROJECTS Work type: Pavement Preservation <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.