New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOSEPHINE COUNTY <br />/~ <br />/\ <br />:. <br />~.._~ <br />~~ _. <br />~, <br />\. <br />,_ ~: <br />Name: US 199: ROGUE COMMUNITY COLLEGE TO MIDWAY AVENUE Key: 14599 <br />Hwy/St: REDWOOD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-199 <br /> Planning: <br />Milepoints: <br />3.39 to 4,44 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />INSTALL MEDIAN BARRIER <br />$0 <br />$150,000 <br />$96,000 <br />$0 <br />$1,023,000 <br />$0 <br />$1.269.000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2008 <br />Work type: Safe <br />Name: LOWER SUCKER CREEK BRIDGE (HOLLAND LOOP ROAD) <br />Key: 14264 <br />Hwy/St: HOLLAND LOOP ROAD <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />1.00 to 0.00 Design: <br />AC.1,/AREA: Land Purchase: <br />RVACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REPLACE COUNTY BRIDGE <br />$0 <br />$405,000 2007 <br />$58,000 2008 HBRR $52,043 <br />$0 <br />$2,883,000 2009 HBRR $2,586,916 <br />$0 <br />$3,346,000 Applicant: JOSEPHINE COUNTY <br />Status: Const. scheduled to begin in 2009 <br />Work type: Brid e <br />Name: HUNGER CREEK BRIDGE #413010 <br />Hwy/St: DAVIDSON ROAD Key: 14982 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Planning: <br />Milepoints: <br />0.04 to 0.05 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />REPLACE STRUCTURE #413010 <br /> <br />$167,000 2010 HBRR $149,849 <br />$208,000 2010 HBRR $186,638 <br />$0 <br />$958,000 2009 HBRR $859,613 <br />$0 <br />$1,333,000 Applicant: JOSEPHINE COUNTY <br />Status: Const. scheduled to begin in 2009 <br />Work type: Bridge <br />Name: I-5: HOMESTEAD TO S GOLD HILL -BUNDLE 313 <br />Key: 14260 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />OTIAIII ~ $12,495,000 <br />Description: Total: $15,086,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPAIR 5 BRIDGES 08383N, 083835, 07601 B, 08381N,083815 Work type: Bridge <br />Route: -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.