New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOSEPHINE COUNTY <br />Name: I-5: LOUSE CREEK - US 199 -BUNDLE 304 Key: 14043 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$2,595,000 <br />$0 <br />$0 <br />$19,305,000 <br />$0 <br />Description: Total: $21,900,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE BR# 08341, 08018N, 080185 Work type: Bridge <br />Name: I-5: N GRANTS PASS - JUMPOFF JOE Key: 13885 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />58.02 to 67.10 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />PAVEMENT PRESERVATION <br />$0 <br />$510,000 2008 IM $470,322 <br />$0 <br />$0 <br />$5,100,000 2009 IM $4,703,220 <br />$0 <br />$5.610,000 Applicant: ODOT <br />Status: Const. scheduled to begin in 2009 <br />Work type: Pavement Preservation <br />Nadie; " I-5 @ MP74 SAFETY IMPROVEMENTS Ke 13777 <br />Hwy/St: PACIFIC y <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.f/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1,200,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />REPLACE PAVING, SUPERELEVATION & DRAINAGE Work type: Safetv <br />Name: I-5 TRUCK CLIMBING LANES: SEXTON TO STAGE PASS Key: 14990 <br />Hwy/St: PACIFIC <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-5 <br /> Planning: <br />Milepoints: <br />60.00 to 80.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$225,000 2008 HSIP $207,495 <br />$75,000 2009 HSIP $69,165 <br />$100,000 2009 HSIP $92,220 <br />$1,600,000 2011 STP $890,122 HSIP $560,698 <br />$0 <br />Description: Total: $2,000,000 Applicant: ODOT Status: Const. scheduled to begin in 2011 <br />ADD TRUCK CLIMBING LANES FROM SEXTON SUMMIT TO STAGE SUMMIT Work type: Safetv <br />Footnote: Project has Operations element <br />Name: OR 99/238 PAVING (GRANTS PASS) Key: 13818 <br />Hwy/St: VARIOUS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-99 <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />RVACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: <br />GRIND & INLAY PAVEMENT <br />$0 <br />$200,000 2007 <br />$0 <br />$0 <br />$3,050,000 2009 BIKPED $1,220,000 NHS $821,030 STP $821,030 <br />$0 <br />3 250 000 Applicant: ODOT <br />Status: Const. scheduled to begin m ZUU9 <br />Work type: Pavement Preservation <br />Footnote: Project has Bikped element <br />Z00g-211 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search .Page 217 <br />
The URL can be used to link to this page
Your browser does not support the video tag.