DOUGLAS COUNTY <br />Name: CAVITY CREEK COVERED BRIDGE PRESERVATION (#19C018) Key: 15632 <br />Hwy/St: CAVITY CREEK RD #82 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.02 Design: <br />AC.f/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 140 000 Applicant: DOUGLAS COUNTY Status: Const. scheduled to begin in 2008 <br />REPAIR DECK; RAIL RETROFIT; EPOXY INJECT TIMBER TRUSS; REPLACE Work type: Bridee <br />PLANKS & ROOF; PAINT HOUSE <br />Name: ROCHESTER COVERED BRIDGE PRESERVTION (#19C487) Key: 15631 <br />Hwy/St: ROCHESTER ROAD #lOG <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.51 to 0.55 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 176 000 Applicant: DOUGLAS COUNTY Status: Const. scheduled to begin in 2008 <br />REINSTALL ORIG SWAY BRACING; REPL DECKHOUSE/PLANKS/CURB; Work type: Bridee <br />RAIL/EPOXY INJECT TRUSS;PAINT <br />Name: NEAL LANE COVERED BRIDGE PRESERVATION (#19C220) Key: 15630 <br />Hwy/St: NEAL LANE RD #124 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.37 to 0.39 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 121 000 Applicant: DOUGLAS COUNTY Status: Const. scheduled to begin in 2008 <br />REPLACE DECK PLANKS/CURB,SUBSTRUCTURE ELEMENTS,EPOXY INJECT Work type: Bridee <br />TIMBER TRUSS, PAINT HOUSE <br />Name: N UMPQUA RIVER (BROWN) BRIDGE #19C484 Key: 15467 <br />Hwy/St: COUNTY RD 6 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />5.00 to 5.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,058,000 2007 <br />$200,000 2008 HBRR $179,460 <br />$0 <br />$12,397,000 2009 HBRR $11,123,828 <br />$0 <br />Description: Total: $13,655,000 Applicant: DOUGLAS COUNTY Status: Const. scheduled to begin in 2009 <br />REPLACE BRIDGE 19C484 Work type: Bridee <br />Name: CURTIS CREEK BRIDGE #19C510 Key: 14981 <br />Hwy/St: COX ROAD #196 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.08 to 0.07 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$237,000 2010 HBRR $212,660 <br />$49,000 2010 HBRR $43,968 <br />$0 <br />$1,703,000 2011 HBRR $1,528,102 <br />$0 <br />Description: Total: $1,989.000 Applicant: DOUGLAS COUNTY Status: Const. scheduled to begin in 2011 <br />REPLACE STRUCTURE #19C510 Work type: Bridee <br />2008-2011 FINAL STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 197 <br />