New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-2011 STIP Final
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2008-2011 STIP Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:38 AM
Creation date
6/1/2009 12:22:33 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
1/16/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VARIOUS COUNTIES <br />Name: REGION 2 ILLUMINATION REPLACEMENTS Key: 13794 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Milepoints: Planning: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br />Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$186,000 2006 <br />$4,000 2008 STP $3,589 <br />$0 <br />$1,262,000 2008 STP $1,132,393 <br />$0 <br />Description: Total: $1,452,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />ILLUM AT I-5 @ N ALBANY, I-5 @ GLENWOOD AND OR569 @ RIVER RD Work type: Onerations <br />Name: REGION 2 SIGNAL REPLACEMENTS Key: 13796 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I,/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$227,000 2006 <br />$224,000 2008 STP $200,995 <br />$0 <br />$2,244,000 2009 STP $1,953,135 BIKPED $67,320 <br />$0 <br />Description: Total: 2 695 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />TRAFFIC SIGNAL REPLACEMENTS IN REGION 2 Work type: Operations <br />Footnote: Project has Bikped element <br />Name: REGION 2 THERMOPLASTIC MATERIAL PURCHASE Key: 14201 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 250 000 Applicant: ODOT Status: Non-Construction Project 2008 <br />PURCHASE DURABLE STRIPING MATERIAL Work type: Operations <br />Name: REGION 2 PRESERVATION PROJECT RESERVE Key: 15382 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $5,379,000 Applicant: ODOT Status: Pooled Funding 2010 <br />POOL FOR FUTURE PRESERVATION PROJECTS Work type: Pavement Preservation <br />Name: REGION 2 PAVEMENT MARKERS (2008) Key: 14931 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 646 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />SURFACE MOUNT PAVEMENT MARKER INSTALLATION Work type: Safe <br />2008-2011 FINAL STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 180 <br />i <br />_l <br />,_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.