VARIOUS COUNTIES <br />Name: REGION 2 ILLUMINATION REPLACEMENTS Key: 13794 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br />Milepoints: Planning: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />VARIOUS Utility Reloc: <br />Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$186,000 2006 <br />$4,000 2008 STP $3,589 <br />$0 <br />$1,262,000 2008 STP $1,132,393 <br />$0 <br />Description: Total: $1,452,000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />ILLUM AT I-5 @ N ALBANY, I-5 @ GLENWOOD AND OR569 @ RIVER RD Work type: Onerations <br />Name: REGION 2 SIGNAL REPLACEMENTS Key: 13796 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />AC.I,/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$227,000 2006 <br />$224,000 2008 STP $200,995 <br />$0 <br />$2,244,000 2009 STP $1,953,135 BIKPED $67,320 <br />$0 <br />Description: Total: 2 695 000 Applicant: ODOT Status: Const. scheduled to begin in 2009 <br />TRAFFIC SIGNAL REPLACEMENTS IN REGION 2 Work type: Operations <br />Footnote: Project has Bikped element <br />Name: REGION 2 THERMOPLASTIC MATERIAL PURCHASE Key: 14201 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 250 000 Applicant: ODOT Status: Non-Construction Project 2008 <br />PURCHASE DURABLE STRIPING MATERIAL Work type: Operations <br />Name: REGION 2 PRESERVATION PROJECT RESERVE Key: 15382 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $5,379,000 Applicant: ODOT Status: Pooled Funding 2010 <br />POOL FOR FUTURE PRESERVATION PROJECTS Work type: Pavement Preservation <br />Name: REGION 2 PAVEMENT MARKERS (2008) Key: 14931 <br />Hwy/St: VARIOUS HIGHWAYS <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: -- <br /> Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 646 000 Applicant: ODOT Status: Const. scheduled to begin in 2008 <br />SURFACE MOUNT PAVEMENT MARKER INSTALLATION Work type: Safe <br />2008-2011 FINAL STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 180 <br />i <br />_l <br />,_ <br />